My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15575
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:56:07 AM
Creation date
10/11/2019 7:56:03 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/3/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY DENYING THE APPEAL AND APPROVING A DOWNTOWN PLANNED COMMUNITY PERMIT INCLUDING TWO GUIDELINE DEVIATIONS, TENTATIVE MAP, AND AFFORDABLE HOUSING PLAN FOR 1409 EL CAMINO REAL PURSUANT TO THE CITY OF REDWOOD CITY'S DOWNTOWN PRECISE PLAN, AND SUBDIVISION ORDINANCE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
04/03/2017 <br />[COA][FINANCE] <br />55. Hours of Construction — Construction activity is permitted between 7:00 a.m. <br />and 8:00 p.m. Monday through Friday, except as permitted on weekends by the <br />Building Official, and shall adhere to the City's Noise Ordinance. If possible, <br />the noisiest construction activities would be scheduled for daytime hours when <br />the ambient noise levels are highest. ][BUILDING] <br />56. Construction Meetings — The applicant is required to contact the Permit <br />Counter (650.780.7350) to schedule the following meetings prior to or during <br />construction. [COA][BUILDING] <br />a. Pre -Submittal — Prior to building permit submittal, schedule a pre- submittal <br />meeting with Building, Planning, Engineering and Fire staff to discuss the <br />permitting process and submittal requirements. <br />b. Pre -Construction - After City permits are issued, but prior to start of <br />construction, schedule a pre -construction meeting with Engineering, <br />Building, Fire, and Planning staff to discuss the inspection process and <br />requirements for construction and site work. The applicant shall arrange for <br />the attendance of the owner, developer, construction manager, contractor, <br />and all subcontractors who are responsible for grading and erosion and <br />sedimentation protection controls. After City permits are issued the project <br />manager or jobsite superintendent shall schedule a pre- construction meeting <br />with the project field inspectors, contractors and sub- contractors to go over <br />the expectations that the field inspectors will have. <br />c. Interior Finishes & Amenities - After sheetrock inspection but prior to <br />installation, contact the Project Planner and Housing Staff to verify, to the <br />City's satisfaction, that all interior finishes and amenities in the affordable <br />units are equivalent to amenities used in market rate units. <br />57. Materials Mock -Up — Prior to framing inspection, prepare a mock-up that is <br />outdoors, readily accessible, and will remain intact until the project has <br />reached substantial completion. The mock-up should include all project colors and <br />materials, windows for the base and top, balconies, lighting, and architectural <br />details, as well as construction details, such as the weep screed, to understand <br />how the design addresses them. Then schedule a mock-up meeting with the <br />Planning and Building Departments for final review and approval of the project <br />details. Submit an updated colors and materials board or details if any changes <br />are made as a result of the mock-up meeting. <br />58. Certification Letters - Prior to final inspection, submit certification letters <br />from the following architects verifying that the project, as constructed, complies <br />with approved plans. After the certification letter has been submitted, the <br />project planner will also confirm substantial compliance with the approved plans <br />during the scheduled final inspection. [COA][PLANNING]: <br />a. Project Landscape Architect verifying substantial conformance with the <br />approved landscape plan, including species, size, quantity, and location <br />ATTY/RESO.0031/ CC RESO ADOPTING DENIAL OF APPEAL BY REDWOOD CITY RESIDENTS FOR RESPONSIBLE DEVELOPMENT <br />REV: 03-30-17 PR RESO. NO. 15575 <br />MUFF NO. 603 <br />Page 18 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.