My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15582
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:56:14 AM
Creation date
10/11/2019 7:56:10 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE CALIFORNIA WAY WATER TANK, PUMP STATION AND PIPELINE PROJECT; ADOPTION OF CEQA FINDINGS; AND ADOPTION OF A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT AND SELECTING THE HILLSIDE ALTERNATIVE PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program —Hillside Alternative <br />Impact BI0-6: Project <br />construction could result in <br />the spread of invasive, non- <br />native French broom or other <br />invasive plants on the site. <br />Mitigation Measure 13I0-6: French broom <br />Implementation: <br />(Genista monspessulana) stands or other <br />The City shall either <br />invasive plants on the site shall be removed <br />carry out this <br />from the site outside of the blooming period <br />measure itself or <br />(April through June for French broom) and <br />incorporate this <br />removed plants shall be bagged or placed in <br />biology mitigation <br />a covered container (dumpster or covered <br />measure into all <br />truck) and disposed of at a landfill. All <br />appropriate bid, <br />equipment used for the removal of French <br />contract, and <br />broom or other invasive plants shall be <br />engineering and site <br />cleaned before being used at another, non- <br />plan (e.g. building, <br />infested part of the site. <br />grading, <br />improvement plans) <br />documents. <br />Timing: Prior to <br />any ground- <br />EXHIBITB <br />Monitoring: The City's Initials: <br />Engineering Division <br />shall review all Date: <br />appropriate bid, <br />contract, and <br />engineering and site <br />(building, grading, <br />improvement plans) <br />documents for inclusion <br />of biological measures. <br />A report shall be <br />submitted to the City <br />documenting the broom <br />removal. <br />Page 12 of 28 <br />ATfY/ RESO.0043/CC RESO HILLSIDE ALTERNATIVE PROJECT RESO. NO. 15582 <br />REV: 05-06-17 PR MUFF NO. 902 <br />
The URL can be used to link to this page
Your browser does not support the video tag.