Laserfiche WebLink
Mitigation Monitoring and Reporting Program —Hillside Alternative <br />Impact BI0-6: Project <br />construction could result in <br />the spread of invasive, non- <br />native French broom or other <br />invasive plants on the site. <br />Mitigation Measure 13I0-6: French broom <br />Implementation: <br />(Genista monspessulana) stands or other <br />The City shall either <br />invasive plants on the site shall be removed <br />carry out this <br />from the site outside of the blooming period <br />measure itself or <br />(April through June for French broom) and <br />incorporate this <br />removed plants shall be bagged or placed in <br />biology mitigation <br />a covered container (dumpster or covered <br />measure into all <br />truck) and disposed of at a landfill. All <br />appropriate bid, <br />equipment used for the removal of French <br />contract, and <br />broom or other invasive plants shall be <br />engineering and site <br />cleaned before being used at another, non- <br />plan (e.g. building, <br />infested part of the site. <br />grading, <br />improvement plans) <br />documents. <br />Timing: Prior to <br />any ground- <br />EXHIBITB <br />Monitoring: The City's Initials: <br />Engineering Division <br />shall review all Date: <br />appropriate bid, <br />contract, and <br />engineering and site <br />(building, grading, <br />improvement plans) <br />documents for inclusion <br />of biological measures. <br />A report shall be <br />submitted to the City <br />documenting the broom <br />removal. <br />Page 12 of 28 <br />ATfY/ RESO.0043/CC RESO HILLSIDE ALTERNATIVE PROJECT RESO. NO. 15582 <br />REV: 05-06-17 PR MUFF NO. 902 <br />