My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15588
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15588
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:56:23 AM
Creation date
10/11/2019 7:56:19 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/22/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY DENYING THE APPEAL AND APPROVING A DOWNTOWN PLANNED COMMUNITY PERMIT INCLUDING FIFTEEN GUIDELINE DEVIATIONS, TENTATIVE MAP, CONDOMINIUM PERMIT, PLANNED DEVELOPMENT PERMIT, DENSITY BONUS PARKING RATIO AND PARKING REDUCTION FOR 612 JEFFERSON AVENUE PURSUANT TO THE CITY OF REDWOOD CITY'S DOWNTOWN PRECISE PLAN, SUBDIVISION ORDINANCE, AND AFFORDABLE HOUSING IMPACT FEE ORDINANCE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/22/2017 <br />Multi -Story Buildings: If the available municipal water supply cannot provide the <br />required fire flow to meet the design density for the design area required for the car <br />stacker area, a tank and pump must be provided meeting all of the requirements noted <br />above in accordance with the California Fire Code, NFPA 13, NFPA 14 and NFPA 20. <br />Standpipes: Car stackers installed interior to parking garages/buildings shall be <br />provided with manual wet standpipe connections at all points of access at each parking <br />level within the garage. <br />46. Elevator Requirements — The following requirements for elevators apply: <br />[SDR][BUILDING][FIRE] <br />a. One elevator shall be available for use as an accessible means of egress in <br />case of emergency. <br />b. One elevator shall be connected to backup generator power in order to remain <br />operable during emergencies. This elevator shall be provided with appropriate <br />signage and shall extend to all floors including the lower levels of the parking <br />structure <br />c. The elevators shall be equipped with smoke curtains. <br />Construction -Related Activities <br />47. Verification for Dimensions — All dimensions, including building location on the site, <br />setbacks, building height, etc. shall be verified by a licensed surveyor. A survey report <br />shall be provided to the Building Inspector for review and approval. [COA][BUILDING] <br />48. Hours of Construction — Construction activity is permitted between 7:00 a.m. and <br />8:00 p.m. Monday through Friday, except as permitted on weekends by the Building <br />Official, and shall adhere to the City's Noise Ordinance. If possible, the noisiest <br />construction activities would be scheduled for daytime hours when the ambient noise <br />levels are highest. [SDR][BUILDING] <br />49. Construction Sign - Prior to the start of any construction work, including demolition, <br />install at least one 36" x 48" (minimum) construction sign in a visible location along <br />the project frontage for the duration of construction. The sign shall include, at <br />minimum, the following information: project name & address, elevation or rendering, <br />construction manager (name, phone number), anticipated completion (season, year), <br />and the City's permitting website http://permits.redwoodcity.org [COA][PLANNING] <br />50. Construction Meetings — The applicant is required to contact the Permit Counter <br />(650.780.7350) to schedule the following meetings prior to or during construction. <br />[COA][BUILDING] <br />Pre -Submittal — Prior to building permit submittal, schedule a pre -submittal meeting <br />with Building, Planning, Engineering and Fire staff to discuss the permitting process <br />and submittal requirements. <br />b. Pre -Construction - After City permits are issued, but prior to start of construction, <br />schedule a pre -construction meeting with Engineering, Building, Fire, and Planning <br />ATTY/RESO.0048/CC RESO 612 JEFFERSON (HABITAT) APPEAL <br />REV: 05-23-17 VR <br />Page 13 of 22 <br />RESO. NO. 15588 <br />MUFF NO. 603 <br />
The URL can be used to link to this page
Your browser does not support the video tag.