My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15604
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15604
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:56:33 AM
Creation date
10/11/2019 7:56:32 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/26/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY AMENDING AND ADOPTING CERTAIN FEES AND CHARGES FOR PUBLIC WORKS SERVICES, SUPERSEDING SECTION 5 OF RESOLUTION 15381; AND SUPERSEDING CERTAIN PREVIOUSLY ADOPTED FEES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Proposed Fees <br />A. ELECTRIC VEHICLE CHARGING FEE <br />$2.00/ hr <br />$5.00/ hr <br />$475.00 <br />$508.00 <br />$570.00 <br />i. Industrial/ Irrigation $901.00 <br />ii. Residential/ Commercial $1,567.00 <br />i. Industrial/ Irrigation $1,309.00 <br />ii. Residential/ Commercial $1,959.00 <br />i. Industrial/ Irrigation $2,069.00 <br />ii. Residential/ Commercial $2,490.00 <br />i. Industrial/ Irrigation $3,597.00 <br />ii. Residential/ Commercial $4,021.00 <br />iii. Fire Rated Master Meter $10,032.00 <br />i. Industrial/ Irrigation $6,188.00 <br />ii. Residential/ Commercial $6,830.00 <br />iii. Fire Rated Master Meter $12,432.00 <br />i. Industrial/ Irrigation $10,434.00 <br />ii. Residential/ Commercial $11,242.00 <br />iii. Fire Rated Master Meter $18,333.00 <br />Fees <br />1. Electric Vehicle Charging Level I & II Stations <br />2. Electric Vehicle Fast Charging Stations <br />B. WATER CONNECTIONS <br />1. Water Service Meter Fee - Meter and Installation (Meter type <br />determined by City Staff.) <br />h. 6" Meter Size <br />i. 8" Meter Size <br />a. 5/8" Meter Size <br />b. 3/4" Meter Size <br />c. 1" Meter Size <br />d. 1-1/2" Meter Size <br />e. 2" Meter Size <br />f. 3" Meter Size <br />g. 4" Meter Size <br />PUBLIC WORKS
The URL can be used to link to this page
Your browser does not support the video tag.