My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15632
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:57:27 AM
Creation date
10/11/2019 7:57:05 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/4/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE EL CAMINO REAL CORRIDOR PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Lindy Chan Page 11 October 27, 2017 <br />Delay at the cross-street approaches with El Camino Real is reported for the study intersections. Under the <br />preferred alternative configuration, cross-street approach delay would increase overall by 19 percent as compared <br />to existing conditions. The cross-street approach delay is summarized in Table 7. <br />Table 7 – Existing and Preferred Alternative Intersection Side-Street Approach Delay <br />Study Intersection Existing Preferred Alternative <br />AM Peak PM Peak AM Peak PM Peak <br />EB WB EB WB EB WB EB WB <br />1. El Camino Real/Whipple Avenue 55.5 42.6 88.8 47.1 55.6 39.6 85.7 52 <br />2. El Camino Real/Brewster Avenue 37.7 37.1 36.8 41.6 35.9 35.3 35.8 40.3 <br />3. El Camino Real/James Avenue 41.3 37.4 86.8 42.9 42.9 49.2 52.1 53.3 <br />4. El Camino Real/Jefferson Avenue 40.7 39.3 41.1 47.9 40.3 36.4 45.1 54.9 <br />5. El Camino Real/Maple Street -- 30.5 -- 40.2 -- 35.8 -- 39.0 <br />6. El Camino Real/Roosevelt Avenue 54.0 -- 51.6 -- 50.7 -- 50.1 -- <br />7. El Camino Real/Oak Avenue 56.0 -- 49.1 -- 53.8 -- 48.1 -- <br />8. El Camino Real/Redwood Avenue-Main Street -- 12.7 -- 16.9 108.3 14.5 57.7 16.3 <br />9. El Camino Real/Hazel Avenue-Laurel Street 311.6 51.8 125.6 138.4 311.6 51.8 327 138.4 <br />10. El Camino Real/Oakwood Drive-Dumbarton Ave 26 31.8 40.7 43.5 24.3 29.3 39.8 42.4 <br />Total Side-Street Delay 622.8 283.2 520.5 418.5 723.4 291.9 741.4 436.6 <br />Change in Side-Street Delay -- -- -- -- 100.6 8.7 220.9 18.1 <br />Percent Change in Side-Street Delay -- -- -- -- 16% 3% 42% 4% <br />Overall Percent Change 19% <br />Notes: WB = Westbound; EB = Eastbound; Results are shown as Delay; Delay is measured in average seconds per vehicle <br /> <br />SAB/RCI006.M2 <br />Attachments: Operational Analysis Output
The URL can be used to link to this page
Your browser does not support the video tag.