Laserfiche WebLink
REDWOOD CITY EL CAMINO REAL CORRIDOR PLAN <br />2 <br />Over time, El Camino Real through Redwood City <br />has evolved into an auto-oriented thoroughfare with <br />inconsistent conditions for pedestrians, bicyclists, <br />businesses, and residents. <br />1918 <br />1950 1970 <br />The “Five Points” intersection (El Camino Real, Woodside Road, and Redwood Avenue) <br />in 1918 and 1950, before the Woodside Road overpass was built. <br />El Camino Real at BroadwaySource: Redwood City Local History RoomSource: Redwood City Local History RoomSource: Redwood City Local History Room