My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15632
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:57:27 AM
Creation date
10/11/2019 7:57:05 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/4/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE EL CAMINO REAL CORRIDOR PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Arterial Level of ServiceAM Peak Hour Existing Conditions Preferred Alternative9/18/2017El Camino Real Corridor PlanSimTraffic ReportW-TransPage 10Arterial Level of Service: NB El Camino Real #1Delay Travel Dist ArterialCross StreetNode (s/veh) time (s) (mi) SpeedDumbarton Ave10 14.5 25.2 0.2 31Laurel St9 6.5 59.9 0.5 33Main St8 19.0 28.5 0.1 13Oak Ave7 2.8 11.1 0.1 26Roosevelt Ave6 11.6 26.1 0.2 22Beech St92 5.1 13.7 0.1 22Maple St5 6.7 10.5 0.0 1298 6.2 25.3 0.2 26Jefferson Ave4 21.7 27.4 0.1 9James Ave3 21.0 39.7 0.2 17Brewster Ave2 12.5 36.4 0.2 24Whipple Ave1 19.4 47.9 0.3 23Claremont Ave121 2.6 9.8 0.1 25Total149.5 361.4 2.3 23Arterial Level of Service: SB El Camino Real #1Delay Travel Dist ArterialCross StreetNode (s/veh) time (s) (mi) SpeedWhipple Ave1 20.8 26.9 0.1 9Brewster Ave2 11.3 42.4 0.3 26James Ave3 35.4 59.0 0.2 15Jefferson Ave4 28.5 46.1 0.2 1498 5.2 12.5 0.1 19Maple St5 5.4 23.1 0.2 29Lincoln Ave92 1.3 5.5 0.0 23Roosevelt Ave6 12.3 20.6 0.1 14Oak Ave7 31.0 48.8 0.2 12Redwood Ave8 32.5 43.4 0.1 7Hazel Ave9 4.4 15.1 0.1 24Oakwood Dr10 25.9 78.8 0.5 25Total214.0 422.2 2.1 18Arterial Level of ServicePM Peak Hour Existing Conditions Preferred Alternative9/18/2017El Camino Real Corridor PlanSimTraffic ReportW-TransPage 13Arterial Level of Service: NB El Camino Real #1Delay Travel Dist ArterialCross StreetNode (s/veh) time (s) (mi) SpeedDumbarton Ave10 16.6 27.4 0.2 28Laurel St9 12.2 64.3 0.5 30Main St8 18.1 29.6 0.1 14Oak Ave7 4.2 12.4 0.1 23Roosevelt Ave6 11.8 26.8 0.2 21Beech St92 4.8 13.4 0.1 22Maple St5 5.7 9.4 0.0 1398 17.3 36.2 0.2 18Jefferson Ave4 32.5 38.9 0.1 6James Ave3 14.7 33.4 0.2 20Brewster Ave2 12.5 36.8 0.2 24Whipple Ave1 34.6 64.9 0.3 17Claremont Ave121 3.6 10.9 0.1 22Total188.8 404.5 2.3 20Arterial Level of Service: SB El Camino Real #1Delay Travel Dist ArterialCross StreetNode (s/veh) time (s) (mi) SpeedWhipple Ave1 22.5 28.5 0.1 8Brewster Ave2 11.9 44.0 0.3 25James Ave3 28.8 53.0 0.2 17Jefferson Ave4 40.7 58.3 0.2 1198 4.2 11.5 0.1 21Maple St 5 5.9 23.8 0.2 28Lincoln Ave92 1.6 5.8 0.0 22Roosevelt Ave6 9.0 17.3 0.1 17Oak Ave7 15.5 30.1 0.2 19Redwood Ave8 14.4 22.7 0.1 13Hazel Ave9 3.1 13.3 0.1 32Oakwood Dr10 16.5 66.8 0.5 28Total174.0 375.2 2.1 20
The URL can be used to link to this page
Your browser does not support the video tag.