My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15632
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:57:27 AM
Creation date
10/11/2019 7:57:05 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/4/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE EL CAMINO REAL CORRIDOR PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHAPTER 5 | IMPLeMentAtIon <br />77 <br />Long-term <br />topic Action corresponding <br />Strategies Responsible Party <br />Mobility <br />Bus Stop Improvements. Work with SamTrans to ensure all bus stops are <br />well-designed and maintained, and that higher-utilized stops incorporate <br />special design features such as shelter structures, lighting, real time sched- <br />ules, and artwork. <br />1M, 1O Engineering in coordination <br />with SamTrans <br />Mobility <br />Detailed Design Drawings. Prepare detailed Design Drawings for El <br />Camino Real that consider: <br />• Reduced lane widths <br />• Removal/relocation of on-street parking <br />• Loading/unloading zones to support El Camino Real businesses, people with <br />mobility impairments, and the use of car sharing <br />• Appropriate intersection designs based on right-turn volumes and available <br />right of way <br /> -Protected intersections if turning volumes are less than 100 in the peak <br />hour <br /> -Maintain vehicle right turn lane if turning volumes are 100 or greater in the <br />peak hour <br />• Raised and painted bikeways at driveways <br />• Bus stop locations and feasibility/placement of “floating” bus stops <br />• Inclusion of green infrastructure design elements where feasible to meet the <br />City’s goals for capture and treatment of storm water runoff as outlined by the <br />National Pollutant Discharge Elimination System (NPDES) Municipal Regional <br />Permit <br />• Increased bike amenities <br />• Parking management plan <br />• Accessibility for first responders (emergency vehicles) <br />• Options for trash service <br />• Bike barrier options including potential for landscaping <br />1F, 1H, 1I, 1K, 2L, <br />4O <br />Community Development, <br />Engineering; consultation with <br />SamTrans and Caltrans <br />Mobility Protected Bikeway Design. Prepare Plans, Specifications, and Estimate <br />(PS&E) for preferred design alternative for protected bikeways.1H Community Development, <br />Engineering
The URL can be used to link to this page
Your browser does not support the video tag.