Laserfiche WebLink
CHAPTER 5 | IMPLeMentAtIon <br />79 <br />Long-term <br />topic Action corresponding <br />Strategies Responsible Party <br />Mobility <br />Woodside Overpass. Improve sidewalk conditions with improved sight <br />lines, physical barriers, and lighting and install public art under the Wood- <br />side Overpass. <br />1E, 4G Engineering in coordination <br />with Caltrans <br />Mobility <br />Crossing Distances. Shorten crossing distance at intersections using me- <br />dian refuges and, where design permits, refuges associated with protected <br />bikeway barriers. <br />1A, 1B, 1H, 2E Engineering in coordination <br />with Caltrans <br />Mobility <br />Local Circulator. In conjunction with implementation of the Citywide <br />Transportation Plan and Streetcar Feasibility Study, conduct a feasibility <br />study for a local circulator/shuttle with stops along the Corridor and at the <br />Transit Center. <br />1P <br />Community Development, En- <br />gineering in coordination with <br />transit providers as appropriate <br />Mobility Bus Stop Relocation. Work with SamTrans to move the identified bus <br />stops.1I, 1J Engineering in coordination <br />with Caltrans and SamTrans