My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:20 AM
Creation date
10/11/2019 7:59:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Description
A RESOLUTION OF THE CITY COUNCIL CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 1548 MAPLE STREET PROJECT; ADOPTING CEQA FINDINGS; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation HYD -4: Implement Mitigation Measure HYD -2. <br />Finding: Implementation of Mitigation Measure HYD -2 would reduce project -related <br />impacts to existing drainage patterns which could contribute to flooding on- and off-site to a <br />less -than -significant level. <br />Facts in Support of Finding: Mitigation Measure HYD -2 measure appropriately <br />identifies the need for hydraulic evaluations for improvements within 100 -year flood zones, <br />as well as modifications consistent with best management practices to reduce potential on - <br />and off-site flooding impacts. <br />Impact HYD -5: The construction and operation of improvements associated with <br />the proposed project and the project variant within 100 -year flood zones could potentially <br />impede or redirect flood flows. <br />Mitigation HYD -5: Implement Mitigation Measures HYD -2 and HYD -3. <br />Finding: Implementation of Mitigation Measures HYD -2 and HYD -3 would reduce <br />project -related impacts to flood flows within 100 -year flood zones to a less -than -significant <br />level. <br />Facts in Support of Findina: Mitigation Measures HYD -2 and HYD -3 appropriately <br />identify the need for hydraulic evaluations and a Construction Period Stormwater Drainage <br />Control Plan consistent with best management practices to reduce potential on- and off-site <br />flooding impacts. <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR— 1548 MAPLE RESO. NO. 15661 <br />REV: 04-30-18 PR MUFF NO. 601 <br />Page 21 of 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.