My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:20 AM
Creation date
10/11/2019 7:59:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Description
A RESOLUTION OF THE CITY COUNCIL CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 1548 MAPLE STREET PROJECT; ADOPTING CEQA FINDINGS; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Develop a community that includes quality architecture, landscape, and streetscape to <br />capitalize on "placemaking" features that define Redwood City's harbor; <br />• Activate and beautify the waterfront by creating key public recreation amenities via the <br />Bay Trail. Help the City prioritize the waterfront for public -oriented and water -dependent <br />uses and activities; <br />• Accommodate educational use amenities along the Bay Trail that invite hands-on <br />learning experiences that feature the history and ecology of Redwood City; <br />• Contribute to a pedestrian and bike recreational thoroughfare connecting Downtown <br />Redwood City to the waterfront that addresses circulation, visual, and aesthetic <br />concerns; <br />• Provide housing at a scale and density appropriate to the project site and sufficient to <br />support the creation of public waterfront amenities; <br />• Provide a blend of habitat, recreational, and residential uses within the harbor area; <br />• Preserve potential historical resources via relocation of the existing water tank to <br />adjacent City -owned property; <br />• Fortify the site against future sea level rise by raising the site significantly; <br />• Mitigate lead in soil and volatile organic compounds (VOCs) in soil gas as part of project <br />construction; and <br />• Mitigate environmental hazards on the site as identified by soils investigations. <br />Discussion of Findings Relating to the Alternatives <br />The FEIR evaluates the proposed project against two (2) alternatives, summarized below <br />(Chapter 6, pages 277-288 of the DEIR). Of these, the Reduced Development alternative is <br />the environmentally superior alternative as it would result in an overall smaller development <br />footprint and shorter construction period, would not generate any new significant impacts, <br />and would avoid impacts to the Water Tank. <br />The No Project alternative assumes that neither the proposed project nor the project <br />variant would be developed and that the project site would generally remain in its current <br />condition. The project site would continue to be occupied by and used for site <br />maintenance activities, marina -related storage, diesel engine repair, and marina <br />operations. The existing Water Tank would remain in its current location. <br />2. The Reduced Development alternative would result in redevelopment of the site with a <br />residential townhome community. However, the total number of units would be reduced <br />to 92 units. Buildings M, H, G, and F would not be developed and a portion of these <br />areas would instead by developed with open space consisting of a public park. In <br />addition, Buildings I and E would also not be developed and the existing Water Tank <br />would be retained on site and additional open space and landscaping would be <br />developed around this structure. Open space, circulation and parking, infrastructure, soil <br />remediation, and grading improvements would generally still occur, as well as the partial <br />extension of Blomquist Street. <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR — 1548 MAPLE RESO. NO. 15661 <br />REV: 04-30-18 PR MUFF NO. 601 <br />Page 23 of 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.