My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:20 AM
Creation date
10/11/2019 7:59:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Description
A RESOLUTION OF THE CITY COUNCIL CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 1548 MAPLE STREET PROJECT; ADOPTING CEQA FINDINGS; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />Table 1: Mitigation Monitoring and Reporting Program <br />Impact Mitigation Measures <br />H. HYDROLOGY AND WATIJR QUALITY _ <br />HYD -1: If construction of the HYD -l: Implement Mitigation Measure HAZ-1 <br />proposed project or the project <br />variant results in the reuse of <br />existing contaminated soil or <br />contaminated imported fill <br />materials for use as engineered <br />fill or for surcharging, impacts <br />to water quality could occur. <br />HYD -2: The retaining wall, <br />HYD -2: Proposed improvements within 100 -year flood <br />placement of fill material, <br />zones and coastal flooding hazard areas, and proposed <br />reconstruction of Maple Street, <br />improvements affecting stormwater drainage systems (e.g., <br />or other improvements <br />the proposed retaining wall and placement of fill and/or <br />occurring within the current <br />other potential improvements) shall be analyzed using <br />100 -year flood zone along <br />detailed hydraulic evaluations to ensure that the <br />Redwood Creek could increase <br />improvements would not impede or redirect flood flows, <br />the depth and velocity of flood <br />contribute to exceeding the capacity of existing stormwater <br />flows along the existing banks, <br />drainage systems, or alter the hydrodynamics of stormwater <br />which could result in erosion <br />flows such that erosion could occur. The detailed hydraulic <br />and siltation during operation of <br />evaluations shall be performed and certified by a <br />the proposed project and the <br />professional engineer, and shall quantify the following <br />project variant, <br />information. <br />• The potential for improvements within 100 -year flood <br />zones, coastal flooding hazard areas, and drainage <br />courses to impede or redirect flood flows including <br />storm -related flooding and coastal flooding hazards <br />including tsunamis, sea level rise, and extreme high <br />tides. <br />• The potential for improvements to stormwater drainage <br />systems to exceed the capacity of existing off-site <br />stormwater drainage systems. <br />• The potential for improvements within 100 -year flood <br />zones, coastal flooding hazard areas, and drainage <br />courses to result in changes to the extent and depth of <br />flooding. <br />ATTY/RE50.0035/CC RESO CERTIFYING FINAL EIR-1548 MAPLE <br />REV: 04-30-18 PR <br />Page 46 of 49 <br />IS48 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Timeframe for <br />Responsibility for <br />Oversight of <br />Implementation <br />Implementation <br />Implementation <br />Prior to issuance <br />Project Applicant <br />Redwood City <br />of certificate of <br />Community <br />occupancy <br />Development <br />Director <br />Prior to issuance <br />Project Applicant <br />Redwood City <br />of grading permits <br />Community <br />Development <br />Director <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.