Laserfiche WebLink
<br /> 05/07/2018 <br />Page 9 of 21  <br />ATTY/RESO.0033/CC RESO 1548 MAPLE APPROVING PROJECT PERMITS RESO. NO. 15662  <br />REV: 04‐30‐18 PR  MUFF NO. 601   <br /> <br />7. Signage. A final detailed signage plan shall be submitted to Planning for approval prior <br />to issuance of a building permit. The signage plan shall provide details of the <br />interpretative sign displays, include a material sample, provide locations of all signs, shall <br />comply with the City’s sign ordinance regulations and shall be consistent with the Plans <br />approved by the City Council. [Planning] <br /> <br />8. Mitigation Measures. Provide written documentation of compliance with all required <br />mitigation measures prior to issuance of a final Certificate of Occupancy. <br />[COA][PLANNING] <br /> <br />9. Architectural Advisory Committee Review. The development requires final review by <br />the Architectural Advisory Committee to address the rear buildings elevations of the <br />buildings facing Redwood Creek prior to building permit issuance. <br /> <br />Fees <br /> <br />The following fees must be paid in full prior to issuance of th e building permit unless otherwise <br />described in the Development Agreement. <br /> <br />10. Transportation Impact Fee ‐ Pay a Traffic Impact Fee for the net new trips resulting <br />from the proposed project. [SDR] [ENGINEERING] <br /> <br />11. Parks Impact Fee – Pay a Parks Impact Fee for the new dwelling units resulting fro m the <br />proposed project, prior to final map approval. [SDR][PARKS] <br /> <br />12. School Impact Fee – For residential additions greater than 500 square feet and new <br />commercial or industrial construction, pay a School Impact Fee to the Sequoia Union High <br />School District. Information regarding this fee may be obtained by contacting the Sequoia <br />Union High School District at (650) 369‐1411. [SDR][SCHOOL DISTRICT] <br /> <br />13. Water and Sewer Fees – Pay applicable water, recycled water, and wastewater‐related <br />fees as outlined on the City’s website. [SDR][ENGINEERING] <br /> <br />14. Mitigation Fees – the project is subject to additional fees as outlined in the adopted  <br />Mitigation Monitoring Plan. [COA][ENGINEERING]  <br />  <br />15. Notice of Fees Protest – The applicant may protest any fees, dedications, reservations, <br />or other exactions imposed by the City as part of the approval or as a condition of <br />approval of this development. Per California Government Code Section 66020, this 90‐ <br />day protest period has begun as of the date of the approval of this application. <br />[SDR][OFFICE OF THE CITY ATTORNEY] <br /> <br />Landscaping and Site Improvements <br /> <br />16. Water‐Efficient Landscaping – Provide a landscaping and irrigation plan conforming to <br />the California Water‐Efficient Landscape Ordinance (AB 1881), including an automatic <br />irrigation system (drip, micro‐spray, or bubblers) with a rain sensor, and show these <br />measures on the building permit plans. [COA][PLANNING] <br />