Laserfiche WebLink
6. Transportation Impact Fee - Pay a Traffic Impact Fee for the net new trips <br />resulting from the proposed project, estimated at $59,729. [SDR] <br />[ENGINEERING] <br />7. Parks Impact Fee — Pay a Parks Impact Fee for the net new dwelling units <br />resulting from the proposed project, estimated at $1,213,891. SDR][PARKS] <br />8. School Impact Fee — For residential additions greater than 500 square feet and <br />new commercial or industrial construction, pay a School Impact Fee to the <br />Seauoia Union Hiah School District. Information regarding this fee may be <br />obtained by contacting the Sequoia Union High School District at (650) 369-1411. <br />[SDR][SCHOOL DISTRICT] <br />9. Water and Sewer Fees — Pay applicable water, recycled water, and <br />wastewater- related fees as outlined on the Citv's website. SDR][ENGINEERING] <br />10. Veterans Boulevard Crossing Improvements — The applicant shall pay fair <br />share contributions toward Veterans Boulevard crossing improvements (NMPP <br />Chapter 3, <br />#4). [COA][PLANNING] <br />11. Notice of Fees Protest — The applicant may protest any fees, dedications, <br />reservations, or other exactions imposed by the City as part of the approval or <br />as a condition of approval of this development. Per California Government Code <br />Section 66020, this 90 -day protest period has begun as of the date of the <br />approval of this application. [SDR][OFFICE OF THE CITY ATTORNEY] <br />Landscaping and Site Improvements <br />12. Water -Efficient Landscaping — Provide a landscaping and irrigation plan <br />conforming to the California Water -Efficient Landscape Ordinance (AB 1881), <br />including an automatic irrigation system (drip, micro -spray, or bubblers) with a <br />rain sensor, and show these measures on the building permit plans. <br />[COA][PLANNING] <br />13. Tree Survey - Provide a tree survey that identifies type, diameter at breast <br />height (DBH), condition and location prior to building permit issuance. <br />[COA][PLANNING] <br />14. Tree Protection - Provide tree protection measures for ordinance -sized trees <br />near the project and show these measures on the building permit plans. <br />[COA][PLANNING] <br />15. Tree Removal Permit - Obtain a Tree Removal Permit for the removal and <br />tree trimming of all ordinance -size trees (number, type and location) defined <br />ATTY/RESO.0041/CC RESO DENYING THE APPEAL FOR 353 MAIN STREET RESO NO. 15665 <br />REV: 05-14-18 PR MUFF NO. 603 <br />Page 9 of 29 <br />