My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15767
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15767
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:28 AM
Creation date
10/11/2019 8:01:27 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY IDENTIFYING THE 2019-20 ROADWAY PAVEMENT MANAGEMENT PROGRAM, IN ACCORDANCE WITH THE STREETS AND HIGHWAYS CODE FOR THE ROAD MAINTENANCE AND REHABILITATION ACCOUNT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Redwood <br />City as follows: <br />1. The above recitals are accurate and are incorporated herein by reference. <br />2. The following is a list of projects planned to be funded with Road <br />Maintenance and Rehabilitation Account revenues: <br />FY 2019-20 List of Projects <br />ProjectTitle <br />2019 Microsurfacing Project <br />Project Locations <br />Marine Parkway, City Limit to Corriente Pointe Drive <br />• Alameda de las Pulgas, Woodside Road to City Limits <br />• Vera Avenue Alameda de las Pul as to EI Camino Real <br />Estimated Useful Project Life <br />5 to 7 years <br />Proposed Schedule for Completion <br />Fiscal Year 2019-20 <br />Project Description <br />This program addresses ongoing roadway pavement repair and <br />replacement needs. The Roadway Management Program <br />inventories, assesses, and tracks maintenance of the City's <br />roadways. Each year, streets are prepared for resurfacing with <br />crack sealing and spot repairs before being resurfaced with an <br />"overlay;' "cape seal;' "microsurfacing emulsion," or "slurry seal". <br />In Fiscal Year 2019-20, the City intends to use RMRA funding to do <br />pavement repair and to install a micro surfacing emulsion on the <br />above listed streets. <br />ProjectTitle <br />Hopkins Avenue Overlay Project <br />Project Locations <br />Hopkins Avenue, EI Camino Real to Upland Road <br />Estimated Useful Project Life <br />8 to 15 years <br />Proposed Schedule for Completion <br />Fiscal Year 2019-20 <br />Project Description <br />The project will include crack sealing and spot repairs before an <br />overlay. Work includes ADA curb ramp rehab/repair/installation, <br />bicycle lane rehab/repair, new striping and marking installation, and <br />adjustment of utilities to grade. <br />ProjectTitle <br />Fiscal Year 2018-19 Roadway Pavement Management Program <br />Project Locations <br />Chestnut Street, EI Camino Real to Railroad <br />• Warwick Street, Edgewood Road to City Limits <br />• Middlefield Road, Jefferson Avenue to Main Street <br />• Spring Street, Woodside Road to Douglas Street <br />Estimated Useful Project Life <br />8 to 15 years <br />Proposed Schedule for Completion <br />Fiscal Year 2019-20 <br />Project Description <br />This program addresses ongoing roadway pavement repair and <br />replacement needs. The Roadway Management Program <br />inventories, assesses, and tracks maintenance of the City's <br />roadways. Each year, streets are prepared for resurfacing with crack <br />sealing and spot repairs before being resurfaced with an overlay. <br />3. This resolution shall be effective upon is date of adoption. <br />ATTY/RESO.0050/CC RE50 IDENTIFYING 19-20 ROADWAY PAVEMENT MANAGEMENT PROGRAM RESO. NO. 15767 <br />REV: OS -13-19 PR MUFF NO. 701 <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.