My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15780
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:53 AM
Creation date
10/11/2019 8:01:47 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE GREEN INFRASTRUCTURE PLAN IN ACCORDANCE WITH PROVISION C.3.J OF THE MUNICIPAL REGIONAL PERMIT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
06/24/2019 <br />RESOLUTION NO. 15780 <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD <br />CITY APPROVING THE GREEN INFRASTRUCTURE PLAN IN <br />ACCORDANCE WITH PROVISION C.3.J OF THE MUNICIPAL <br />REGIONAL PERMIT <br />WHEREAS, the San Francisco Bay Regional Water Quality Control Board's <br />Municipal Regional Permit (MRP) regulates stormwater discharges from municipal storm <br />drain systems throughout San Mateo County, including the City of Redwood City; and <br />WHEREAS, Provision C.3.j of the MRP requires each permittee to develop a <br />Green Infrastructure (GI) Plan that demonstrates how permittees will gradually shift from <br />traditional "gray" storm drain infrastructure—which channels polluted runoff directly into <br />receiving waters without treatment—to a more resilient and sustainable storm drain <br />system comprised of "green" infrastructure, which captures, stores and treats stormwater; <br />and <br />WHEREAS, the MRP also requires that GI Plans be collectively designed to <br />achieve specific reductions in mercury and PCBs (polychlorinated biphenyls) within <br />specific time horizons; and <br />WHEREAS, on May 22, 2017, the City Council approved the Workplan to Develop <br />a Green Infrastructure Plan in accordance with provision C.3.j of the MRP as was required <br />by the MRP to be done no later than June 30, 2017; and <br />WHEREAS, the City/County Association of Governments of San Mateo County <br />(C/CAG) has been working with its member agencies, including Redwood City staff <br />members, to develop model GI documents, which Redwood City staff members <br />incorporated into the GI Plan; and <br />WHEREAS, the GI Plan, attached as Exhibit A, details the required tasks to be <br />compliant with MRP requirements, including those aspects that will be implemented by <br />C/CAG and those by local agencies; and <br />WHEREAS, while the cost to implement the GI Plan is yet to be determined, it is <br />the intent of the City of Redwood City to allocate sufficient resources to ensure timely <br />development of GI in accordance with MRP requirements. <br />NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF REDWOOD CITY <br />DOES RESOLVE AS FOLLOWS: <br />1. The recitals set forth above are true and correct, and are hereby <br />incorporated herein by this reference as if fully set forth in their entirety. <br />ATTY/RESO.0075/CC RESO APPROVING THE GREEN INFASTRUCTURE PLAN RESO. NO. 15780 <br />REV: 06-20-19 PR MUFF NO. 802 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.