My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15780
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:53 AM
Creation date
10/11/2019 8:01:47 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE GREEN INFRASTRUCTURE PLAN IN ACCORDANCE WITH PROVISION C.3.J OF THE MUNICIPAL REGIONAL PERMIT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY <br />2 RAA Model and GI Targets <br />Provisions C.11 and C.12 in the MRP require San Mateo Permittees (San Mateo <br />County and its 20 cities and towns) to reduce estimated PCBs loading by 15 <br />grams/year and estimated mercury loading by 6 grams/year using green <br />infrastructure by June 30, 2020. Regionally, Permittees must also project the <br />load reductions achieved via green infrastructure by 2020, 2030, and 2040, <br />showing that collectively, reductions will amount to 3 kg/year of PCBs and 10 <br />kg/year of mercury by 2040. <br />This planning process developed and assessed projections for the square <br />footage of impervious surface to be retrofitted and treated with green <br />infrastructure from private projects within the Redwood City's jurisdiction by <br />2020, 2030, and 2040. It also incorporates targets for the square footage of <br />impervious surface to be retrofitted and treated with green infrastructure <br />through potential public projects within the Redwood City's jurisdiction by <br />2020, 2030, and 2040. <br />2.1 Reasonable Assurance Analysis and GI <br />Implementation Goals <br />The Municipal Regional Stormwater Permit (MRP) (Order No. R2-2015-0049) <br />requires the development of GI Plans (Provision C.3) and PCBs and Mercury <br />Control Measure Implementation Plans (Provisions C.11 and C.12) that provide <br />the necessary pollutant load reductions to meet TMDL WI -As over specified <br />compliance periods. A key component of these plans is a Reasonable <br />Assurance Analysis (RAA) that quantitatively demonstrates that proposed <br />control measures will result in sufficient load reductions of PCBs and mercury <br />to meet WI -As for municipal stormwater discharges to the Bay. The <br />City/County Association of Governments (C/CAG) of San Mateo County, via its <br />San Mateo Countywide Water Pollution Prevention Program (SMCWPPP), led <br />a county -wide effort to develop an RAA to estimate the baseline PCB and <br />mercury loads tothe Bay, determine load reductions to meet WLAs among San <br />Mateo County Permittees, and set goals for the amount of GI needed to meet <br />the portion of PCB and mercury load reduction the MRP assigns to GI <br />(SFBRWQCB 2015). Appendices C and D include documentation of the county- <br />wide RAA, including: <br />• Phase I Baseline Modeling Report — Provides documentation of the <br />development, calibration, and validation of the baseline hydrology <br />RWC GREEN INFRASTRUCTURE PLAN <br />GREEN INFRASTRUCTURE PLAN <br />8 JUNE 2019 <br />ATTY/RESO.0075/CC RESO APPROVING THE GREEN INFRASTRUCTURE PLAN — EXHIBIT A RESO. NO.15780 <br />REV: 06-20-19 PR MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.