My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15780
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:53 AM
Creation date
10/11/2019 8:01:47 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE GREEN INFRASTRUCTURE PLAN IN ACCORDANCE WITH PROVISION C.3.J OF THE MUNICIPAL REGIONAL PERMIT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY <br />GREEN INFRASTRUCTURE PLAN <br />Redwood Shores <br />Library Art Play <br />Structure and <br />This project will install a public art piece <br />Playground — <br />with a public accessible playground. <br />Planning <br />Still Evaluating <br />399 Marine Pkwy <br />The Middlefield Road project includes <br />Middlefield Road Utility <br />construction of a joint utility trench (JUT) <br />Underground Project— <br />to accommodate new and relocated <br />underground electrical and <br />Design Complete <br />Yes <br />telecommunication lines, as well as <br />streetscape improvements between Main <br />Middlefield Road <br />Street and Woodside Road. <br />between Woodside <br />Road and Main Street <br />Hopkins Traffic Calming <br />This project will install traffic calming <br />Project <br />measures based on Public outreach in the <br />neighborhood surrounding the project <br />Pilot Program <br />Still Evaluating <br />Hopkins Ave between <br />area <br />Broadway and Alameda <br />De Las Pulgas <br />4.3 Workplan for Completion <br />As identified in Section 2.7 the City intends to construct the Regional <br />Stormwater Capture Project at Red Morton Community Park between 2030- <br />2040. Since that project and the development policiesare intended to meet <br />the goals of the MRP, any other CIP projects with the inclusion of GI will not <br />be considered a priority. This will need to be revisited from time to time, and <br />will be part of the City's adaptation plan (Section 8). <br />RWC GREEN INFRASTRUCTURE PLAN <br />29 JUNE 2019 <br />ATN/RESO.0075/CC RESO APPROVING THE GREEN INFRASTRUCTURE PLAN — EXHIBITA RESO. NO. 15780 <br />REV: 06-20-19 PR MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.