My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15780
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:53 AM
Creation date
10/11/2019 8:01:47 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE GREEN INFRASTRUCTURE PLAN IN ACCORDANCE WITH PROVISION C.3.J OF THE MUNICIPAL REGIONAL PERMIT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY <br />Funding Options <br />7.1 Funding Strategies Developed Regionally <br />BASMAA created the 'Roadmap for Funding of Sustainable Streets" in which <br />it describes a roadmap that was developed to identify and remedy obstacles <br />to funding for Sustainable Street projects, which are defined as projects that <br />include both Complete Street improvements and green stormwater <br />infrastructure, and that are maintained in a state of good or fair condition. <br />It includes specific actions in the roadmap that are designed to improve the <br />capacity — both statewide and in the San Francisco Bay Area -- to fund <br />Sustainable Street projects that support compliance with regional permit <br />requirements to reduce pollutant loading to San Francisco Bay, while also <br />helping to achieve the region's greenhouse gas reduction targets. <br />It also states some of the challenges of obtaining funding. To date, Sustainable <br />Streets have faced funding obstacles due to the restrictions of various funding <br />programs, which may not recognize the potential for overall cost savings that <br />local agencies may achieve through multi -benefit Sustainable Streets projects. <br />For example, some transportation grants may fund only some aspects of a <br />Sustainable Street project, while resource grants may fund other aspects. <br />Assembling multiple funding sources brings new challenges and costs to a <br />project. The roadmap also identifies the financial needs to support the <br />placement of Sustainable Streets, considering that cities throughout the Bay <br />Area, and in other parts of California, are required to invest in widespread <br />construction of infrastructure projects that remove pollutants from <br />stormwater runoff in order to achieve water quality goals for San Francisco <br />Bay. The cost is anticipated to parallel the costs to meet similar requirements <br />in other parts of the state. For example, City of Los Angeles alone, over the <br />next 20 to 30 years, has estimated that $7 to $9 billion dollars will be needed <br />to implement the city's Water Quality Compliance Master Plan for Urban <br />Runoff (Farfsing and Watson 2014). <br />Lastly, the roadmap includes the benefits, which include climate change <br />mitigation, air quality improvement, water quality improvement, localized <br />flood control, and community benefits. <br />RWC GREEN INFRASTRUCTURE PLAN <br />GREEN INFRASTRUCTURE PLAN <br />33 JUNE 2019 <br />ATTY/RE50.0075/CC RESO APPROVING THE GREEN INFRASTRUCTURE PLAN — EXHIBIT A RESO. NO. 15780 <br />REV: 06-20-19 PR <br />MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.