My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15780
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:53 AM
Creation date
10/11/2019 8:01:47 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE GREEN INFRASTRUCTURE PLAN IN ACCORDANCE WITH PROVISION C.3.J OF THE MUNICIPAL REGIONAL PERMIT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8 Adaptive Management.........................................................................39 <br />8.1 Process for Plan Updates...................................................................39 <br />8.2 Pursuing Future Funding Sources.......................................................39 <br />8.3 Alternative Compliance and Credit Trading Investigations ................ 39 <br />9 References............................................................................................40 <br />Tables <br />Table 1. Model scenarios objectives and cost -benefit evaluation ................. 17 <br />Table 2. Scenario 1: GI implementation strategy for Redwood City (sediment <br />target, with regional identified project).................................................21 <br />Table 3. CIP Projects with Green Infrastructure Potential...............................26 <br />Figures <br />Figure 1. RAA Process Flow Chart (USEPA 2017) ............................................10 <br />Figure 2. SRP Prioritized Green Street Opportunities.....................................11 <br />Figure 3. Modeling System Supporting the RAA.............................................14 <br />Figure 4. Example Implementation Recipe Showing General Sequencing of GI <br />Projects...................................................................................................15 <br />Figure 5. Modeling System Supporting the RAA.............................................19 <br />Figure 6. Scenario 1: Optimization summary for Redwood City (sediment <br />target, with regional identified project).................................................20 <br />Figure 7. Scenario 1: Map of GI capacities within each subwatershed of <br />Redwood City (sediment target, with regional identified project) ......... <br />22 <br />Figure 8. Summary GI capacity for interim and final implementation <br />milestones.............................................................................................. <br />24 <br />Appendices (links) <br />A. Resolution adopting GI Work Plan. <br />B. Regional Stormwater Capture Project at Red Morton Community Park <br />C. Phase I Baseline Modeling Report — Provides documentation of the <br />development, calibration, and validation of the baseline hydrology and <br />water quality model, and the determination of PCB and mercury load <br />reductions to be addressed through GI implementation (SMCWPPP 2018). <br />D. Phase II Green Infrastructure Modeling Report— Provides documentation <br />of the application of models to determine the most cost-effective GI <br />RESO. NO. 15780 <br />MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.