My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 Bottomley Design and Planning
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Under $60K
>
Agmt07 Bottomley Design and Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2007 11:30:24 AM
Creation date
10/30/2007 11:30:24 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Bottomley Design and Planning
PROJECT NAME
Bottomley Design and Planning
Date
10/24/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT "A" <br /> <br />SCOPE OF SERVICES <br /> <br />Bottomley Design & Planning (BDP) will provide the City of Redwood City with urban design <br />and planning assistance as needed to evaluate and modify various capital improvement and <br />development projects within the city. Initial work shall consist of assistance with: a) design <br />concepts and detailed plans for capital improvements to EI Camino Real, and related <br />coordination and review meetings with city departments and Caltrans; b) review of site <br />development and architectural plans for the Paseo Park development project located adjacent to <br />the City of Redwood City main library; c) review and planning of public spaces in the <br />downtown areas of Redwood City as directed by City staff and d) linkages and pedestrian <br />connections. <br /> <br />Services will be provided on an as-requested, time and materials basis in accordance to the <br />attached fee schedule with a not-to-exceed maximum of $20,000. <br /> <br />ATTY/AGR/2007.073 <br />092107 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.