My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res04 14590
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res04 14590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:54:01 AM
Creation date
10/11/2019 9:53:43 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
6/7/2004
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR MARINA SHORES VILLAGE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Legend: Applicant = project applicant, City = City of Redwood City <br />Page 57 May 18, 2004 WP9.016451MMCHT.645 <br />Mu.-4iTORING <br />VERIFICATION <br />IDENTIFIED IMPACT <br />RELATED MITIGATION MEASURE <br />Impl. <br />Type of Impl. <br />Monitoring and <br />Timing <br />Signature <br />Date <br />(CONDITION OF APPROVAL) <br />Entity <br />Action <br />Verification Entity <br />Requirements <br />borings, cone penetration tests, and /or <br />equivalent methods; and <br />Determination of parcel- specific soil <br />response characteristics and maximum <br />credible ground acceleration for an <br />earthquake recurrence interval <br />specified by the City of Redwood City. <br />Recommendations from the investigations, <br />including appropriate soil stabilization and <br />foundation construction techniques, <br />minimum setbacks around potentially <br />unstable areas, and criteria for the <br />compaction and treatment of on -site fills, <br />shall be incorporated into the project grading <br />and foundation plans. In general, these <br />recommendations are expected to include, <br />but not be limited to, the following <br />provisions: <br />• Require all construction to comply with <br />the Uniform Building Code (UBC, 1997) <br />for Seismic Zone Factor 4 and Soil <br />Profile Type S E . Base all project <br />designs on estimates of peak and <br />maximum repeatable earthquake - <br />induced ground surface accelerations <br />expected to occur on the project site, <br />as calculated by the project <br />geotechnical investigations. <br />• Slope or shore excavations in order to <br />minimize ground movements. <br />Typically, when excavation extends into <br />Bay mud, 4:1 or flatter slopes are <br />required to reduce movements. <br />Implementation of these measures- - <br />combined with conformance with standard <br />Uniform Building Code, City of Redwood <br />City, and other applicable regulations - -would <br />reduce the potential effects of ground <br />shaking to a less - than - significant level. <br />Legend: Applicant = project applicant, City = City of Redwood City <br />Page 57 May 18, 2004 WP9.016451MMCHT.645 <br />
The URL can be used to link to this page
Your browser does not support the video tag.