Laserfiche WebLink
Legend: Applicant = project applicant, City = City of Redwood City <br />Page 61 May 18, 2004 WP9.016451MMCHT645 <br />Mu.41TORING <br />VERINuATION <br />IDENTIFIED IMPACT <br />RELATED MITIGATION MEASURE <br />Impl. <br />Type of Impl. <br />Monitoring and <br />Timing <br />Signature <br />Date <br />(CONDITION OF APPROVAL) <br />Entity <br />Action <br />Verification Entity <br />Requirements <br />soil erosion represent a potentially <br />construction shall be either covered with <br />significant impact. <br />impervious surfaces (e.g., buildings and <br />pavement) or fully stabilized with <br />landscaping and /or native vegetation. All <br />revegetated areas shall be irrigated and <br />maintained as necessary to ensure the long- <br />term survival of the vegetation. <br />Implementation of this measure would <br />reduce this potential impact to a less -than- <br />significant level. <br />PUBLIC HEALTH AND SAFETY <br />Impact 12 -1: Safety Impacts Related to <br />Mitigation 12 -1. In addition to the project <br />Applicant/ <br />Submit Notice of <br />City <br />Prior to General <br />San Carlos Airport. The proposed project <br />review required by C /CAG per PUC section <br />City <br />Proposed <br />Plan <br />would introduce new development and several <br />21670 et seq., the applicant must submit a <br />Construction or <br />Amendment/ <br />thousand full -time residents within the <br />Notice of Proposed Construction or <br />Alteration. Submit <br />Precise Plan <br />restricted height area of the San Carlos Airport <br />Alteration (FAA Form 7460 -1) to the FAA for <br />project plans and <br />adoption <br />planning area. This could represent a <br />airspace review. If the proposed project <br />applications to <br />potentially significant impact. <br />structures are deemed to be obstructions to <br />C /CAG Airport <br />air navigation, specific mitigation measures <br />Land Use <br />required by the FAA shall be implemented to <br />Commission for <br />ensure that navigation is not obstructed. <br />review. <br />In order to minimize potential conflict <br />between project development and the <br />continued safe and efficient operation of the <br />San Carlos Airport, and as outlined in the <br />San Carlos ALU P, the City shall forward the <br />project plans and a description of the project <br />as well as the General Plan Amendment <br />and Precise Plan applications to the C /CAG <br />Airport Land Use Commission for <br />Commission review and recommendation. <br />Based on the Commission's review of the <br />proposed project, although outside the San <br />Carlos ALUP designated Avigation <br />Easement Review Area, the project may <br />require the granting of an Avigation <br />Easement over all or an appropriate portion <br />of the project site, following the process <br />outlined in the San Carlos ALUP, Section H, <br />subsection 4, p. IV -52. Under such an <br />Legend: Applicant = project applicant, City = City of Redwood City <br />Page 61 May 18, 2004 WP9.016451MMCHT645 <br />