Legend. Applicant = project applicant, City = City of Redwood City <br />Page 64 May 18, 2004 WP9.016451MMCHT.645 <br />Mou4iTORING <br />VERIFIUATION <br />IDENTIFIED IMPACT <br />RELATED MITIGATION MEASURE <br />Impl. <br />Type of ImpL <br />Monitoring and <br />Timing <br />Signature <br />Date <br />(CONDITION OF APPROVAL) <br />Entity <br />Action <br />Verification Entity <br />Requirements <br />elevate noise levels at adjacent residential <br />incorporating conditions in project demolition <br />noise abatement <br />implement during <br />receptors ( "Villas at Bair Island," Marina <br />and construction agreements that stipulate <br />measures. <br />construction <br />Pointe, Docktown) as well as at on -site <br />the following conventional construction - <br />residential areas constructed and inhabited <br />period noise abatement measures: <br />during earlier phases of the project <br />construction period. Noise levels at 50 feet <br />Construction Plan. Prepare a detailed <br />from the construction equipment source could <br />construction plan identifying the <br />reach approximately 105 dBA, resulting in <br />schedule for major noise - generating <br />intermittent interference with typical residential <br />construction activities. The <br />activities. These noise level increases could <br />construction plan shall identify a <br />exceed the noise limits established in the <br />procedure for coordination with <br />Redwood City Strategic General Plan Noise <br />adjacent noise- sensitive facilities so <br />Element. This possibility represents a <br />that construction activities and the <br />potentially significant short -term noise <br />event schedule can be scheduled to <br />impact. <br />minimize noise disturbance. <br />Noise Disturbance Coordinator. <br />Designate a "noise disturbance <br />coordinator" who would be responsible <br />for responding to any local complaints <br />about construction noise. The <br />disturbance coordinator would <br />determine the cause of the noise <br />complaint (e.g., starting too early, bad <br />muffler, etc.) and institute reasonable <br />measures warranted to correct the <br />problem. Conspicuously post a <br />telephone number for the disturbance <br />coordinator at the construction site. <br />(The City should be responsible for <br />designating a noise disturbance <br />coordinator and the project applicant <br />should be responsible for posting the <br />phone number and providing <br />construction schedule notices). <br />Construction Hours. Restrict noise - <br />generating construction activity to <br />between the hours of 7:00 AM and 7:00 <br />PM, Monday through Friday. Prohibit <br />such construction activities on <br />weekends and holidays. <br />Legend. Applicant = project applicant, City = City of Redwood City <br />Page 64 May 18, 2004 WP9.016451MMCHT.645 <br />