My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res04 14590
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res04 14590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:54:01 AM
Creation date
10/11/2019 9:53:43 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
6/7/2004
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR MARINA SHORES VILLAGE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Legend: Applicant = project applicant, City = City of Redwood City <br />Page 67 May 18, 2004 WP9.016451MMCHT.645 <br />Mt,..iTORING <br />I VERIFILATION <br />IDENTIFIED IMPACT <br />RELATED MITIGATION MEASURE <br />Impl. <br />Type of Impl. <br />Monitoring and <br />Timing <br />Signature <br />Date <br />(CONDITION OF APPROVAL) <br />Entity <br />Action <br />Verification Entity <br />Requirement- <br />Guidelines, shall be implemented. In the <br />event that any human remains are <br />encountered, earthmoving shall be stopped <br />until the County Coroner's office has been <br />contacted. Implementation of these <br />measures will reduce this potential impact to <br />a less - than - significant level. <br />AIR QUALITY <br />Impact 15 -1: Construction Emissions. <br />Mitigation 15 -1. Dust emissions from <br />Applicant <br />Implement fugitive <br />City <br />During <br />Project construction activities, including <br />demolition and construction activities can be <br />dust control <br />demolition and <br />proposed building demolition, excavation and <br />greatly reduced by implementing fugitive <br />measures. <br />construction <br />grading operations, and filling and dredging, <br />dust control measures. The significance of <br />phases <br />associated construction vehicle traffic, and <br />construction impacts is, according to the <br />wind blowing over resultant exposed earth, <br />BAAQMD Guidelines, determined by <br />would generate exhaust emissions and <br />whether or not appropriate dust control <br />fugitive particulate matter emissions that <br />measures are implemented. <br />would affect local air quality. These possible <br />Implementation of the following conventional <br />effects represents a potentially significant <br />BAAQMD-recommended dust control <br />impact. <br />measures would be expected to reduce this <br />impact to a less - than - significant level: <br />(1) Demolition Period Require <br />implementation of the following dust control <br />measures by contractors during demolition <br />of existing structures: <br />(a) Watering shall be used to control dust <br />generation during demolition of <br />structures and break -up of pavement; <br />(b) All trucks hauling demolition debris <br />from the site shall be covered; and <br />(c) Whenever possible, dust -proof chutes <br />shall be used for loading debris onto <br />trucks. <br />(2) All Construction Phases Require <br />implementation of the following dust control <br />measures by construction contractors <br />during all construction phases: <br />Legend: Applicant = project applicant, City = City of Redwood City <br />Page 67 May 18, 2004 WP9.016451MMCHT.645 <br />
The URL can be used to link to this page
Your browser does not support the video tag.