Laserfiche WebLink
Legend. Applicant = project applicant, City = City of Redwood City <br />Page 42 May 18, 2004 WP9.016451MMCHT.645 <br />MO....ORING <br />VERIFICA ION <br />IDENTIFIED IMPACT <br />RELATED MITIGATION MEASURE <br />Impl. <br />Type of Impl. <br />Monitoring and <br />Timing <br />Signature <br />Date <br />(CONDITION OF APPROVAL) <br />Entity <br />Action <br />Verification Entity <br />Requirements <br />appropriate intervals along the length of <br />the swale to slow flow velocities and to <br />increase infiltration opportunities. <br />Revegetate all disturbed areas at the <br />onset (October) of the first winter rainy <br />season following the completion of <br />construction, and at a similar time <br />during the next one to two years as <br />required to fully revegetate the site. <br />Use of an erosion control grass and <br />forb mixture, favoring native species, is <br />best suited to this task. In addition, <br />install biodegradable surface erosion <br />protection (e.g., natural mulch, jute <br />netting, erosion control blankets, <br />punched straw) to reduce the erosive <br />energy of incoming raindrops for at <br />least the first winter season following <br />construction. If project construction <br />spans two consecutive winter seasons, <br />these erosion protection measures <br />shall be implemented at the beginning <br />of each winter season, unless there is <br />successful establishment of vegetal <br />cover after the first year. <br />• Install silt fencing along the <br />construction perimeter prior to the start <br />of construction, and keep the fencing <br />in -place until construction is completed <br />and erosion - control winterization <br />measures are implemented. <br />• Prepare and implement an irrigation <br />scheduling and chemical management <br />plan governing the application of <br />irrigation water and chemical <br />amendments to landscaped areas <br />adjacent to buildings and within or <br />adjacent to parking lot facilities. <br />Components of such a plan likely would <br />include an irrigation schedule linked to <br />soil moisture levels or related variables <br />Legend. Applicant = project applicant, City = City of Redwood City <br />Page 42 May 18, 2004 WP9.016451MMCHT.645 <br />