My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res04 14590
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res04 14590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:54:01 AM
Creation date
10/11/2019 9:53:43 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
6/7/2004
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR MARINA SHORES VILLAGE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Legend. Applicant = project applicant, City = City of Redwood City <br />Page 44 May 18, 2004 WP9.016451MMCHT.645 <br />MG. .ORING <br />VERIFIC#, ION <br />IDENTIFIED IMPACT <br />RELATED MITIGATION MEASURE <br />Impl. <br />Type of Impl. <br />Monitoring and <br />Timing <br />Signature <br />Date <br />(CONDITION OF APPROVAL) <br />Entity <br />Action <br />Verification Entity <br />Requirements <br />Permit from BCDC, and the 401 Water <br />Quality Certification request to the <br />RWQCB. <br />Prior to <br />Implement the dredging operations <br />grading <br />utilizing a suction dredge that minimally <br />permit <br />disturbs adjacent sediments (see <br />issuance <br />Mitigation 8 -1 herein). Confer with the <br />and during <br />Corps to determine the appropriate <br />construction <br />method for the site conditions (e.g., <br />sediment characteristics) and the least <br />environmentally damaging method for <br />sheet piletbulkhead installation and <br />worksite segregation from Bay waters. <br />Implementation of these measures would <br />reduce the impacts of flushing channel <br />dredging and marina filling operations to a <br />less - than - significant level. <br />Impact 9 -4: Project Impacts on Marina and <br />Mitigation 9 -4. Require the following <br />Applicant <br />Conduct identified <br />City <br />Prior to grading <br />Creek Sedimentation and Associated <br />mitigation measures to reduce potential <br />analyses to reduce <br />permit issuance <br />CreekiBay Water Quality Impacts. Project <br />siltation impacts on the marina inlet <br />potential siltation <br />implementation, including an approximately <br />channels and the project reach of Redwood <br />impacts. <br />9.8 -acre reduction in marina open water area, <br />Creek (extending to the Smith Slough <br />would reduce the tidal prism (the water <br />confluence), corresponding dredging needs, <br />volume exchanged between higher high and <br />and associated water quality impacts: <br />lower low waters) which functions to scour <br />tidal sediments from the marina entrances and <br />Require the applicant to conduct <br />from the lower reaches of Redwood Creek. <br />additional hydraulic analyses to verify <br />Consequently, rates of siltation within these <br />to the satisfaction of the City Engineer <br />water bodies would increase, although to an <br />that the marina inlets will operate at <br />uncertain degree. Thus, future dredging and <br />close to a self- scouring condition. If the <br />spoils disposal could be required at higher <br />analyses do not verify probable <br />than existing frequencies, resulting in more <br />maintenance of such a condition, the <br />frequent water quality disturbances and higher <br />project design shall be adjusted <br />costs to the City. This constitutes a <br />accordingly. <br />potentially significant impact. <br />Require the applicant to conduct <br />additional analysis utilizing data on the <br />hydraulic geometry of tidal marshes to <br />determine the effect of a reduction in <br />the Redwood Creek tidal prism on the <br />channel geometry (e.g., depth, cross- <br />Legend. Applicant = project applicant, City = City of Redwood City <br />Page 44 May 18, 2004 WP9.016451MMCHT.645 <br />
The URL can be used to link to this page
Your browser does not support the video tag.