My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res07 14769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:56:07 AM
Creation date
10/11/2019 9:55:53 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE REDWOOD CITY DOWNTOWN PRECISE PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
03/27/2007 <br />Mitigation 9-10. Mitigation of these effects to aless-than-significant level <br />would require construction of an additional mixed flow lane on US 101. This <br />widening is not deemed feasible by the City due to right-of-way constraints and <br />cost. Therefore, the impact is expected to remain significant and unavoidable. <br />Findings: The changes or alterations proposed by mitigation measure 9- <br />10are within the responsibility and jurisdiction of Caltrans and not the City of <br />Redwood City. Caltrans can and should adopt proposed mitigation measure 9- <br />10. <br />Impact 9-11: Project Contribution to Cumulative Impacts at the <br />Alameda de las Pulgas/VVoodside Road Intersection. During the AM and PM <br />peak hours, the addition of project traffic would reduce the level of service (AM <br />peak hour) and increase overall delay by more than five (5) seconds (AM and PM <br />peak hours) at this intersection, which would already be operating at LOS E/F. <br />This effect would represent a significant impact.. <br />Mitigation 9-11. Add a second left-turn lane to the southbound approach <br />of Alameda de las Pulgas. This change would improve operation to LOS D in <br />both peak periods. The project would require median removal and lane restriping. <br />Although this project may be added to Redwood City's Traffic Impact Fee (TIF) <br />program in a future update, there is currently no funding for this project. <br />Therefore, the mitigation is not assured and this impact is considered to be <br />significant and unavoidable. <br />Finding: This City Council of the City of Redwood City finds this impact to <br />be significant and unavoidable. Even though this project may be added to <br />Redwood City's Traffic Impact Fee (TFI) program in a future update, there is <br />currently no funding for this project. This impact is overridden by project benefits <br />as set forth in the statement of overriding considerations. <br />Impact 9-12: Project Contribution to Cumulative Impacts at the EI <br />Camino and Whipple Avenue Intersection. During the AM and PM peak hours <br />the addition of project traffic would increase average delay by more than five (5) <br />seconds at this intersection, which would already be operating at LOS F. This <br />effect would represent a significant impact. <br />Mitigation 9-12. Due to right-of-way constraints, mitigation options at this <br />intersection are limited. Mitigation would require the addition of an exclusive <br />eastbound left-turn lane and converting the eastbound-shared left-through lane <br />into an exclusive through movement. This would allow changing from a current <br />split-phase operation (eastbound/westbound) to a protected left-turn phasing, <br />and would improve operation to LOS D in the AM peak hour and to LOS E in the <br />PM peak hour. However, implementation of this improvement is not deemed <br />feasible by the City due to the need to acquire right-of-way from adjacent <br />Atty/Reso/Reso.1683 ~ 2 14769 <br />030707 Muff #613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.