My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res07 14769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:56:07 AM
Creation date
10/11/2019 9:55:53 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE REDWOOD CITY DOWNTOWN PRECISE PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
03/27/2007 <br />capacity. The estimated Moderate Intensity alternative-related ADDWF increment <br />of 367,334 gpd (0.367 mgd) is less than the City's purchase option of 1.915 mgd. <br />In recent years, wastewater flow to the SBSA collection system from <br />Redwood City has occasionally exceeded the current peak wet weather flow <br />capacity right (exclusive of Redwood Shores) of 25.9 mgd. Since 1994-95, the <br />City has exceeded its allocated capacity nine times during the winter. Since the <br />SBSA treatment capacity allocation to Redwood City is already being exceeded <br />during wet weather, the current allocation from the SBSA is inadequate to serve <br />the project's projected Moderate Intensity alternative ADDWF increment in <br />addition to existing SBSA commitments. Because the SBSA wet weather <br />treatment capacity allocation to Redwood City is already being exceeded, the <br />Precise Plan Moderate Intensity alternative-related and cumulative impacts on <br />wet weather flow treatment capacity are considered to represent a potentially <br />significant project and cumulative impact. <br />Mitigation 10-2. If the Precise Plan Moderate Intensity alternative is <br />adopted, prior to City approval of any future individual development proposal in <br />the Precise Plan area, if determined necessary by the City Engineer, the City <br />shall purchase from the added SBSA the treatment capacity necessary to <br />accommodate the projected net increase in wastewater generated by the <br />proposed development. Each future individual development's ultimate treatment <br />capacity requirement shall be calculated in the final permitting stage. The project <br />applicant shall reimburse the City for the costs associated with the individual <br />development's fair share of the purchase of this treatment capacity (e.g., the <br />capacity option itself, and associated administrative costs) and implementation of <br />one of the transmission capacity improvement options listed below, the <br />procedural details of which shall be included in a development agreement for the <br />project. <br />In order to mitigate the limited transmission capacity during wet weather <br />from the Precise Plan area to the SBSA treatment plant, implementation of one <br />of the following options would be necessary: <br />(1) Upgrade the influent lifting station at the treatment plant, upgrade the <br />treatment plant itself as necessary, install a new gravity sewer line from the <br />SBSA pump station at Maple Street, and upgrade the pump station at Maple <br />Street; or <br />(2) Replace 21,000 feet of 6-inch, 3,600 feet of 8-inch, and 2,000 feet of <br />10-inch pipes within the Precise Plan area, and 6,200 feet of 6-inch pipes outside <br />the Plan area, to reduce the wet weather flows. By replacing existing wastewater <br />collection pipes, and thus reducing infiltration and inflow, the increase in ADDWF <br />from Precise Plan-related growth would be mitigated, and the wet weather flow <br />would not increase from Plan-facilitated development. An additional benefit would <br />be the replacement of all substandard 6-inch pipes with City standard 8-inch <br />pipes. <br />Atty/Reso/Reso.1683 22 14769 <br />030707 Muff #613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.