My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res07 14769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:56:07 AM
Creation date
10/11/2019 9:55:53 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE REDWOOD CITY DOWNTOWN PRECISE PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
03/27/2007 <br />quality. These possible effects of soil erosion represent a potentially significant <br />impact. <br />Mitigation 15-2. Require applicants for future development projects in the <br />Precise Plan area involving a grading area of 10,000 or more square feet to prepare <br />erosion control plans subject to City approval and consistent with the required project <br />Stormwater Pollution Prevention Plans (SWPPPs) as well as Best Management <br />Practices (BMPs) specified by the Redwood City Stormwater Management and <br />Discharge Control Program (Municipal Code Chapter 27A). Implement the plan during <br />construction. Erosion during all phases of construction shall be controlled through the <br />use of erosion and soil transport control facilities. These shall include the use of catch <br />basins and filter fabrics, and the direction of stormwater runoff away from disturbed <br />areas. The plan shall also provide for long-term stabilization and maintenance of <br />remaining exposed soils after construction is completed. Areas disturbed by <br />construction shall be either covered with impervious surfaces (e.g., buildings and <br />pavement) or fully stabilized with landscaping and/or native vegetation. All revegetated <br />areas shall be irrigated and maintained as necessary to ensure the long-term survival of <br />the vegetation. <br />Finding: Implementation of mitigation measure 15-2 would reduce this potential <br />impact to aless-than-significant level. <br />Atty/Reso/Reso.1683 34 14769 <br />030707 Muff #613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.