My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res07 14769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:56:07 AM
Creation date
10/11/2019 9:55:53 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE REDWOOD CITY DOWNTOWN PRECISE PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
p D MONITORING VERIFICATION <br />IDEND IMPACT RELATED MlT1GATiON MEASURE Implementation Monitoring and Timing 5ignatare Date <br />~ Enti Verification Enti Re uirements <br />Impact 6: Project Contribution to Mitigation 9-16. Adding an exclusive City, fair-share City If and when improvements <br />Cumulate Impacts at the Broadwayl northbound left-tum [one on Broadway and reimbursement adopted, City shall conduct <br />Jeffersovenue Intersection. During the converting the existing northbound-shared from future Gnnual traffic monitoring at <br />PM pea our, the addition of project traffic left-through right lane into a shared individual this intersection and <br />would inRaease average delay by more than through/right-tum lane would result in project implement fair-share <br />five (5} seconds at this intersection, which improved LOS F operation with less applicants. requirement when level of <br />would alr~dy be operating at LOS F. This average delay than that experienced under service reaches LOSE „ <br />effect w represent a significanf impact. Cumulative (W ithaut Project) Conditions. (average delay of greatrri~ than <br /> Implementation of this mitigation would 55 seconds}. <br /> therefore reduce the project impact to a <br /> less-than-significant level. <br /> or <br /> Because this mitigation would result in the <br /> loss of sidewalk at corner bulb-outs, <br /> degrading the existng and future <br /> pedestrian environment and sidewalk <br /> dining opportunities, and would be <br /> inconsistent with City policies giving priority <br /> to the Downtown pedestrian environment, <br /> the City may choose to avoid this <br /> intersection modification in the interest of <br /> protecting the pedestrian environment. <br /> This choice would result in a significanf <br /> unavoidable impact based on current <br /> CEO.A and City criteria for "Intersection <br /> Inv acts:' <br />Impact 9-17: Project Contribution to Mitigation 9-17. The intersection of City; fair-share City If and when improvements <br />Cumulative Impacts at the Broadway! Broadway/Middlefield Road is currently a 4- reimbursement adopted, City shalt conduct <br />Middlefield Intersection. During the PM way stop controlled intersection. from future annual traffic monitoring at <br />average delay would increase by <br />peak hour Signalizing the intersection (2-phase individual this intersection and <br />, <br />five (5) seconds or more at this intersectlon, control) would result in LOS C operations project <br />li <br />t implement fair-share <br />requirement when level of <br />which already would be operating at LOS F. under Cumulative (With Project) Conditions app <br />can <br />s. service reaches LOS E <br />This effect would represent a sign cant during the PM peak hour. Implementation <br />of this measure would result in a less-than- (average delay of greater than <br />impact. signifrcant impact 55 seconds}. <br /> or <br /> Because this signalization mitigation would- <br /> (a) tie less supportive of pedestrian <br /> convenience and orientation than the <br /> existing 4-way stop due to delays to <br />~ pedestrians waiting to cross during "walk" <br />= phases and higher vehiGe speeds through <br />~ j the intersection; (b} be inconsistent with <br />~ .A City intentions for this intersection to be <br />p ~ pedestrian-oriented given its location in the <br />~,,~ ~p Downtown core; and (c) be inconsistent <br /> with City policies giving priority to the <br /> Downtown edestrian environment the Ci <br />Page 16 U:1My Documentsli7o~Nntown Prec+se PIaMCC staff reporisiCC 3.12.dcrc43.12.07 ExhrbitslAttachment A mit. monrtori;~g checklist 655.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.