My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res07 14769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:56:07 AM
Creation date
10/11/2019 9:55:53 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE REDWOOD CITY DOWNTOWN PRECISE PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
p D MONITORING VERIFICATION <br />IDEI~l~D IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br />Zl Ent' Verification Ent R uirements <br />~ system, and <br />o individual <br />p projects may <br />~ require <br />O Transportation <br />~ Demand <br />p Management <br />~ <br />W {TDM) plans per <br /> C/CAG adopted <br /> uidelines. <br />impact 9-22: Project Contribution to Mitigation 9-22. Mitigation of this impact to Infrastructure City; C1CAG During project-specific <br />Cumulative Impacts on US 101. Under aless-than-significant level would require improvements environmental review <br />Cumulative (With Project) Conditions, US 101 construction of an additional mixed flow considered not <br />southbound segments from SR 92 to Whipple lane. This widening is not deemed feasible feasible by City; <br />Avenue and from Woodside Road to Marsh due to right-of-way constraints and cost. however, US <br />Road are expected to have V!C ratios greater This impact is therefore considered to be 101 is part of <br />than 1.0 in the AM peak hour, and project slgrtit5canf and unavoidable. CMP roadway <br />traffic would increase the volumes on these system, and <br />segments by more than one percent of their individual <br />capacty. (n the PM peak hour, US 101 projects may <br />southbound segments from Whipple Avenue required <br />to Marsh Road would experience V/C ratos Transportation <br />greater than 1.0, and project traffic would Demand (TDM) <br />increase the volume on these segments by plans per <br />more than one percent of their capacity. C/CAG adopted <br />These effects would represent a significant guidelines. <br />!m act. <br /> <br />PUBLtC SERVICES, UTlLfTlES, AND <br />lNFRASTRUCTl1RE <br />Impact 10-1: Precise Plan-Related and litigation 10-1. Prior to City approval of City; fair-share City Condition of occupancy permit <br />Cumulative impacts en Wastewater any future individual development proposal reimbursement issuance <br />Treatment and Transmission Capacity-- in the Precise Plan area, if determined from future <br />Maximum Intensity Alternative. Precise necessary by the City Engineer, the City individual <br />Plan-facilitated development would increase shall purchase from the Sl3SA the added project <br />licants <br />a <br />t <br />pp <br />. <br />o <br />wastewater generation in the project area. treatment capacity necessary <br />accommodate the projected net increase in <br />Preliminary estimates indicate that the wastewater generated by the proposed <br />Maximum Intensity Precise Plan alternative development. Each future individual <br />t <br />cottagenerate a total of approximately development's ultimate treatment capacty ~ <br />771~2fi gallons of average daily dry weather requirement shall be calculated in the final ~ <br />flout F) per day, for a net increase Rermitting stage. The project applicant <br />shall reimburse the Ci for the costs <br />ov Ming conditions of 630,885 gpd. ~' ~ <br />Reel City already uses all of its allocated associated with the individual <br />' < <br />< <br />s fair share of the purchase of <br />capfdciCpfrom the 56SA treatment plant, but development <br />possesses an option to purchase an this treatment capacty (e.g., the capacity <br />additional 1.915 million gallons per day (mgd} opticn itself, and associated administrative <br />costs and im IementaGon of one of the <br />Page 19 U:IMy DocumentslDawrtown Precise PIanICC staff reportsiCC 3. f2.doc13.12.07 ExhrCRsl4ftachmerrt A mrt.rrn~nrferirg checklist 655.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.