My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res07 14769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:56:07 AM
Creation date
10/11/2019 9:55:53 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE REDWOOD CITY DOWNTOWN PRECISE PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
p MONITORING VERIFICATION <br />'-. <br />tDEND IMPACT <br />RELATED MRIGATION MEASURE <br />Implementation <br />Monitoring and <br />Timing <br />Signature <br />Date <br /> Enti Verification Enti Re uirements <br />traffic estion on local roads, possibly In addition, require City review and <br />interferir~with emergency access and approval of proposed emergency access <br />respons~y the RCFD. These possible provisions prior to approval of individual <br />project cts on emergency access and in development projects in the Precise Plan <br />the Prece Plan area represent a potentially area. Requ'sre individual projects to comply <br />signific~f impact. with all applicable City of Redwood City <br />p road design and emergency access <br />W standards. The City may consider other <br /> alternatives to these requirements if it <br /> determines that such alternatives are <br /> feasible and such access will not jeopardize <br /> emergency response. Implementation of <br /> these measures would reduce impacts on <br /> emergency access and response to a less- <br /> than-si nificant ieveJ. <br />Impact 10-6: Emergency Access and Mitigation 10,6. Implement mitigation City; individual City Condition of grading permit <br />Response Impacts--Moderate Intensity measures identified in chapter 9 project issuance; Held verify <br />Precise Pian Alternative. Traffic from (Transportation and Circulation} of the EiR applicants implementation during grading <br />potential development under the Moderate to reduce project-related traffic impacts on and construction. <br />Intensity alternative would create additional 1oca1 roads to less-than-significant levels. <br />Vaffic congestion on local roads, possibly In addition, require City review and <br />interfering with emergency access and approval of proposed emergency access <br />response by the RCFD. These possible provisions prim to approval of individual <br />project effects on emergency access and in development projects in the Precise Plan <br />the Precise Plan area represent a potentially area. Require individual projects to oomply <br />significant impact. with all applicable City of Redwood City <br /> road design and emergency access <br /> standards. The City may consider other <br /> alternatives to these requirements if it <br /> determines that such alternatives are <br /> feasible and such access will not jeopardize <br /> emergency response. Implementation of <br /> these measures would reduce impacts on <br /> emergency access and response to a tess- <br /> than-si nifrcant level. _.___ <br />NOSE <br />Impact 11-1: Precise Pian-Facilitated Mitigation 11-1. Reduce Precise Plan Individual City Condition of grading permit <br />Demolition and Construction Period Noise. <br />i <br />i implementation-related individual project <br />demolition-and construction-period noise project <br />applicants issuance; field verify <br />implementation during grading <br />i <br />es <br />t <br />Demolition and construction activ <br />faci~Sted by the Downtown Precse Plan impacts on nearby residences by and construction. ~ <br />coctd temporarily elevate noise levels at incorporating conditions in project t <br />near~y~esidential and commercial receptors demolition and construction contract - <br />du~~ roidual, site-specific project agreements that stipulate the following ~ <br />cori~on periods, Noise levels at 50 feet conventional construction-period noise c <br />~ <br />frorWt~E%jemoli6on or construction equipment abatement measures: <br />source could reach approximately 105 dBA, <br />Page 23 U:1My DocumentslDowrtorn Precise PiantCC stall ~eN~orfs1CC 3. f 2.doc13-12.07 ExhibBstAttachment A mit.monttorrng checklist 655.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.