My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res07 14769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:56:07 AM
Creation date
10/11/2019 9:55:53 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE REDWOOD CITY DOWNTOWN PRECISE PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MONITORING VERIFICATION <br />iDEND IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br />~ Enti Verification Enti Re uirements <br />develepnoant is considered normally the buildings, in courtyards, or <br />acceptatn noise environments of 70 d8A orienting the terraces to alleyways <br />CNEL or s. rather than streets, whenever <br /> <br />Future nee levels throughout much of the possible; <br />Prease P.~bn area, especially in the vicinity of Air conditioning in all units so that <br />the Caltr sine, would exceed 55 dBA windows can remain nosed to <br />CNEL. d uses proposed within 250 feet maintain interior noise levels below "` <br />of the C~tOain line, 120 feet from the 45 dBA CNEL; and <br />centerl'sne of EI Camino Reai, or 100 feet from <br />Veterans Boulevard, would be exposed to Sound-rated windows and <br />noise levels of 70 dBA CNEL or higher, construction methods in residential <br />thereby exposing new Precise Pian- units proposed along streets (or the <br />designated, noise-sensitive residential, Caitrain line) where noise levels <br />commercial, recreational, and public facility would exceed 70 dB CNEL. <br />land use development to noise levels <br />exceeding the "normalcy acceptable" Noise levels at residential property lines <br />threshold. These possible long-term adverse around Plan-facilitated development should <br />noise effects would represent a potentially be maintained at an l.~ not in excess of 60 <br />significant impact. dBA during the daytime hours and 50 dBA <br /> during nighttime hours (10:00 PM to 7:00 <br /> AM), unless ambient noise levels are <br /> higher. In those cases, the ambient noise <br /> level would be the noise level standard. <br /> The approval of future commercial projects <br /> near Precise Plan area residential and <br /> other noise-sensitive uses may, ai City <br /> discretion, require a noise study <br /> demonstrating how the project-including <br /> assoc,7ated loading docks, refuse areas, <br /> and ventilation systems-would meet these <br /> standards. <br /> implementation of these measures to the <br /> satisfaction of the Redwood City Building <br /> Department would reduce the potential <br /> impact on new residential uses to a less- <br /> ihan-si niffcant level. <br />arR Quau7v <br />impact 12-1: Construction-Related Air Mitigation 12-1. For ail discretionary Individual City Condition of grading permit <br />Qu~ Impacts. Demolition or construction grading, demakition, or construction activity project issuance; field verify <br />acfi~rTies permitted and/or facilitated by the in the Precise Pian area, require applicants implementation during grading <br />pro~S~ Downtown Prease Plan under both implementation of the following dust control and construction. <br />the {ge~#num Intensify and Moderate tntensity measures by construction contractors, <br />altef~a s may generate construction-period where applicable: <br />exhmissions and fugitive dust that <br />could temporarily but noticeably affect local During demolition of existing structures: <br />Page 27 U:1My pocumentstDowntownn Precise Pfan1CC staff reportstCC 3.12. doe13.72.07 ExhibitsUlttachment A m+t.monitor~g ;,heck!is! 655.dcc <br />
The URL can be used to link to this page
Your browser does not support the video tag.