My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14778
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res07 14778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:56:12 AM
Creation date
10/11/2019 9:56:11 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Special
Agency Type
City Council
Date
5/21/2007
Description
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY REQUESTING AND SUPPORTING A FUTURE REALIGNMENT OF THE BAY TRAIL ON INNER BAIR ISLAND IN REDWOOD CITY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/21 /2007 <br />WHEREAS, the USFWS' plans include closure of the existing Whipple Avenue access <br />to Inner Bair Island, two levee breaches to restore tidal flow to the island, elimination of the <br />continuous loop trail around the island thus converting it into two, non-continuous trail <br />segments leading to observation platforms, and construction of a pedestrian bridge from Bair <br />Island Road in proximity to an existing public parking lot; and <br />WHEREAS, in order to best accommodate and coincide with the USFWS' planned <br />trail alignment and access point changes on Inner Bair Island, Redwood City desires that the <br />Bay Trail Project plan for a complementary realignment, to include Bay Trail designation of <br />the two planned non-continuous trail "spurs," maintaining the existing Bay Trail spine <br />alignment along the western edge of Inner Bair Island, designating the eastern edge of Inner <br />Bair Island including the bridge crossing to Bair Island Road as Bay Trail spine, and <br />eliminating Bay Trail designation on the levee adjacent to Inner Bair Island as a result of the <br />proposed trail access closure at Whipple Avenue; and <br />WHEREAS, such a realignment and designation of Bay Trail on Inner Bair Island will <br />provide the estimated 250,000 annual visitors to Bair Island, from the community of Redwood <br />City and the entire region, with enhanced recreational opportunities as well as more direct <br />and environmentally-sound access, and will be in concert with the USFWS' Bair Island <br />restoration plans. <br />NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br />REDWOOD CITY AS FOLLOWS: <br />That the Council requests the Bay Trail Project incorporate this realignment of <br />the Bay Trail on Inner Bair Island into the Bay Trail Plan. <br />,~ <br />ATTY/RESO/RES0.1704 <br />050307 <br />14778 <br />Muff # 205 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.