My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14802
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res07 14802
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:56:30 AM
Creation date
10/11/2019 9:56:27 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
8/28/2007
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE SEQUOIA HOSPITAL PRECISE PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />08/28/2007 <br /> <br />Standard Condition 4.7-2: Prior to construction, the City of Redwood City shall <br />require submittal of a Stormwater Pollution Prevention Plan (SWPPP) and a Notice of <br />Intent to the RWQCB to control the discharge of stormwater pollutants, including <br />sediment associated with construction activities. Along with these documents, the <br />applicants will also be required to prepare an Erosion Control Plan. The Erosion <br />Control Plan may include Best Management Practices (BMPs) as specified in the <br />California Stormwater Best Management Practice Handbook for reducing impacts on <br />the City's storm drainage system from construction activities. The SWPPP shall include <br />control measures during the construction period for: soil stabilization practices; <br />sediment control practices; sediment tracking control practices; and wind erosion control <br />practices. <br /> <br />Prior to issuance of a grading permit, the applicant shall be required to submit <br />copies of the NOI and Erosion Control Plan to the City Engineer. The applicant <br />shall also be required to maintain a copy of the most current SWPPP on-site and <br />provide a copy to any City representative or inspector on demand. <br /> <br />Finding: City Council of the City of Redwood City adopts Standard Conditions <br />4.7-1 and 4.7-2 as feasible measures, and finds that the implementation of these <br />Standard Conditions would reduce Potential Impact HIWQ-1 of the project to a less- <br />than-significant level. <br /> <br />Potential Impact HIWQ-2: Redevelopment of the Sequoia Hospital campus <br />(Area A) within the Precise Plan area would disturb more than one acre and storm water <br />runoff from the proposed new parking areas and building roof tops could contribute to a <br />degradation of surface water quality of Redwood and Cordilleras Creek, and ultimately, <br />San Francisco Bay. <br /> <br />Standard Condition 4.7-3: As part of the mitigation for post-construction runoff <br />impacts addressed in the construction SWPPP, the project sponsor shall implement <br />regular maintenance activities (i.e., maintaining on-site drainage facilities and <br />landscaping that receives stormwater runoff, litter control) at the site to prevent soil and <br />litter from accumulating on the project site and contaminating surface runoff. Other <br />post-construction source controls and BMPs, including measures identified in STOPPPs <br />Source Control and Model Guidance List include: <br /> <br />. maintenance of landscaped areas as necessary to maintain soil structure and <br />permeability; <br />. site maintenance, including routine catch basin cleaning; <br />. maintenance of landscaping with minimal pesticide and fertilizer use; <br />. connection of parking garage floor drains to water treatment devices; <br />. roofed trash and recycling enclosures; <br />. covering of loading dock area and/or special handling of runoff. <br /> <br />Standard Condition 4.7-4: The property owner shall enter into an operations <br />and maintenance agreement for all permanent stormwater treatment devices. <br /> <br />Atty/Reso/Reso.1738 <br />082207 <br /> <br />8 <br /> <br />14802 <br />Muff # 613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.