My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14828
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res07 14828
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:56:46 AM
Creation date
10/11/2019 9:56:45 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/17/2007
Description
RESOLUTION FINDING AND DETERMINING THAT, BECAUSE OF LOCAL CLIMATIC, GEOLOGICAL AND TOPOGRAPHICAL CONDITIONS, THE PUBLIC HEALTH, SAFETY, WELFARE, AND NECESSITY, REQUIRE CHANGES OR MODIFICATION TO CERTAIN PROVISIONS OF CHAPTER 12 OF THE REDWOOD CITY MUNICIPAL CODE RELATING TO THE ADOPTION BY REFERENCE OF THE "INTERNATIONAL FIRE CODE, 2006 EDITION"; AS MODIFIED AND MADE APPLICABLE TO THE CITY OF REDWOOD CITY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />12/17/2007 <br /> <br />The aforementioned conditions support the imposition of fire-protection and life- <br />safety requirements greater than those set forth in the 2006 Edition of the International <br />Fire Code. <br /> <br />Finding 2: The strongest ground shaking probably will derive from earthquake <br />activity along the San Andreas, Hayward, or Calaveras fault. At least one earthquake <br />of magnitude 7 to 8-1/4 can be expected during a one hundred year period. In addition, <br />several earthquakes of magnitude 6 to 7 can be expected in the San Francisco Bay <br />Region. Any of these earthquakes would cause moderate to severe shaking throughout <br />this region. The City of Redwood City is particularly vulnerable to devastation should <br />any such earthquake occur. <br /> <br />The potential effects of earthquake activity include isolating the City of Redwood <br />City from the surrounding area and restricting or eliminating internal circulation due to <br />the potential for collapse of highway overpasses and underpasses, along with other <br />bridges in the city, or an earth slide, and the potential for vertical movement rendering <br />surface travel unduly burdensome or impossible. <br /> <br />Earthquakes of the magnitude experienced locally can cause major damage to <br />electrical transmission facilities which, in turn, cause power failures while at the same <br />time starting fires throughout the city. The occurrence of multiple fires will quickly <br />disperse existing fire department resources, thereby reducing and/or delaying their <br />response to any given fire. Additionally, without electrical power, elevators, smoke <br />management systems, lighting systems, alarm systems and other electrical equipment <br />needed for building evacuation and fire control in large buildings would be inoperative, <br />thereby resulting in loss of life and/or major losses in such buildings. <br /> <br />Additional potential situations inherent in such an occurrence include loss of city <br />water resources; Hetch-Hetchy Bay Division Pipelines NO.1 and 2, and Hetch-Hetchy <br />Bay Division Pipelines NO.3 and 4 would be expected to suffer damage2, along with <br />inundated areas caused by the failure of earthen dams such as Lower Emerald Lake <br />(Latitude 37028.0' N; Longitude 122023.2' W) and Bear Gulch (Latitude 37026.0' N; <br />Longitude 1220 13.6' W)3; underground water main breaks due to soil movement; <br />cylindrical water storage tank failures due to "elephant's foot" buckling, weakening from <br />corrosion, or sloshing of contents; broken natural gas mains causing structure and other <br />fires; leakage of hazardous materials; the need for rescue from collapsed structures; <br />and the rendering of medical aid to large numbers of people. <br /> <br />2 San Francisco Public Utilities Commission: Its Slow Pace for Assessinq Weaknesses in Its Water <br />Delivery System and for Completinq Capital Proiects Increases the Risk of Service Disruptions and Water <br />Shortaqes, California State Auditor I Bureau of State Audits, Report Number 99124. <br />3 Generalized from maps dam owners are required to prepare and file with the State Office of Emergency <br />Services and available through the Association of Bay Area Governments (ABAG). <br /> <br />Atty/Reso.1762 <br />120307 <br /> <br />4 <br /> <br />14828 <br />Muff # 305 <br />
The URL can be used to link to this page
Your browser does not support the video tag.