Laserfiche WebLink
<br />12/17/2007 <br /> <br />and geology, public health and safety, noise, cultural resources, and air quality would be similar <br />to those associated with the Initial Project and-with the exception of visual impacts, where <br />Alternative 4 would have greater effects than the Project-similar to those of the Project. With <br />respect to population, housing and employment, Alternative 4 would, if feasible, have housing <br />benefits similar to those of both the Initial Project and the Project and, compared to the Initial <br />Project, a similar but increased positive effect on the existing citywide imbalance between jobs <br />and employed residents, reducing in-commuting. However, the reduction in marina fill under <br />Alternative 4 also reduces the land area available for residential structures, making it very <br />difficult to achieve fundamental project objectives, including meeting housing demand and <br />providing affordable housing, and is, therefore, not be a feasible alternative to the Project. <br /> <br />E. Reduced Commercial. with Reduced Buildina Heiahts. Reduced Marina Fill. <br />and Added Park (Alternative 5) <br /> <br />Description: Alternative 5 assumes development of the Project site along lines <br />similar to those described for Alternative 4 but with the addition of a neighborhood park. <br />Accordingly, Alternative 5 would include development of 1,930 condominium residential units for <br />sale, 162,000 square feet of commercial floor area, including 150,000 square feet of office <br />space and 12,000 square feet of convenience retail, and a three-acre neighborhood park. <br />Alternative 5 would include approximately fifteen multi-story residential structures (two more <br />than the Initial Project) and a reduction in maximum residential structure height from 260 feet to <br />190 feet. It would involve more marina fill than the Project but less than the Initial Project <br />(approximately 11 acres for Alternative 4 as opposed to approximately 11.54 acres for the Initial <br />Project and 10 acres for the Project). <br /> <br />Findings: As compared to the Initial Project, Alternative 5-like the Project-- <br />would result in reduced, but still significant, impacts in the areas of visual factors, transportation <br />and circulation, biological resources, and hydrology and water quality. Environmental impacts in <br />the areas of land use, infrastructure and public services, soils and geology, public health and <br />safety, noise, cultural resources, and air quality would be similar to those associated with the <br />Initial Project and the Project. With respect to population, housing and employment, Alternative <br />5, if feasible, would have housing benefits similar to those of both the Initial Project and the <br />Project and, compared to the Initial Project, a similar but increased positive effect on the existing <br />citywide imbalance between jobs and employed residents, reducing in-commuting. Alternative 5 <br />would also reduce the maximum height of residential structures to 190 feet. However, this <br />height reduction, as well as incorporation of the three-acre neighborhood park, significantly <br />reduces the land area available for construction of residential structures, making it very difficult <br />to achieve fundamental project objectives, including meeting housing demand and providing <br />affordable housing, and is, therefore, not be a feasible alternative to the Project. <br /> <br />F. Reduced Commercial. with Reduced Buildina Heiahts. Reduced Marina Fill. <br />Added Hotel. Improved Desian. Increased Retail and Incorporation of <br />Bavfront Study Transit and Transportation Demand Manaaement (TOM) <br />Measures (Alternative 6) <br /> <br />Description: Alternative 6 assumes that the Project site would be developed as <br />a mixed use residential-commercial complex similar to the Initial Project, with the same <br />residential unit total, but with a redesign that would include modifications in building heights and <br />building placement to substantially reduce visual impacts, an increase in the amount of <br />commercial floor area devoted to local-serving convenience retail to "internalize" more vehicular <br />trips and thereby reduce traffic impacts, the addition of a 200-room hotel, and the incorporation <br /> <br />Atty/Reso/Reso.1772 <br />121707 <br /> <br />48 <br /> <br />14829 <br />Muff# 613 <br />