Laserfiche WebLink
<br />12/17/2007 <br /> <br />Findings: As compared to the Project, Alternative 7 would result in reduced, but <br />still significant, impacts in the areas of [land use, visual impacts, and] biological resources. <br />Transportation and circulation impacts would be slightly increased as compared to the Project. <br />Impacts in the areas of hydrology and water quality, infrastructure and public services, soils and <br />geology, public health and safety, noise, cultural resources, and air quality would be similar to <br />those of the proposed Project. With respect to population, housing and employment, Alternative <br />7 would have a less positive effect on the existing citywide imbalance between jobs and <br />employed residents. Alternative 7 would only partially attain most basic Project objectives. In <br />particular, it would result in substantially fewer residential units, thus preventing the Project from <br />attaining the basic objectives of addressing the demand for housing and providing affordable <br />housing options. Based on the foregoing and the discussion in Section 17.7 of the FEIR, the <br />City finds that, on balance, the Project would provide substantially greater public benefits than <br />Alternative 7 and that Alternative 7 is not a feasible alternative to the Project. <br /> <br />H. Reduced Commercial to Permit No Marina Fill (Alternative 8) <br /> <br />Description: Alternative 8 assumes development of the Project site with a <br />residential-commercial complex with similar uses to the Project, but with a reduction in the <br />. scope of the development to eliminate all of the approximately 9.8 acres of marina fill associated <br />with the Project. Alternative 8 also includes a reduction in the maximum residential structure <br />height to 190 feet, as compared to the 230-235 feet maximum residential structure height for the <br />Project, and a reduction in the number of multi-story residential structures from 17 for the <br />proposed Project to seven. With these limitations, Alternative 8 would yield approximately 850 <br />condominium residential units for sale and approximately 203,000 square feet of commercial <br />floor area, including approximately 5,000 square feet of convenience retail. Section 17.10 of the <br />FEIR identifies Alternative 8 as the "environmentally superior alternative" under CEQA. <br /> <br />Findings: As compared to the Project, Alternative 8 would result in substantially <br />reduced, but still significant, environmental impacts in the areas of land use, visual factors, <br />transportation and circulation, biological resources, hydrology and water quality, infrastructure <br />and public services, soils and geology, public health and safety, noise, cultural and historic <br />resources, and air quality. With respect to population, housing and employment, Alternative 8, <br />despite having fewer new residential units than the proposed Project, would nonetheless, <br />because of the reduction in commercial development, have a positive effect on the existing <br />citywide imbalance between jobs and employed residents, reducing in-commuting. Alternative 8 <br />would, however, not attain basic Project objectives identified in the discussion of the No Project <br />Alternative above, with 56 percent fewer residential units than the proposed Project (and a <br />substantial reduction in commercial retail and office floor area) and an overall scope of <br />development which would reduce Project revenue so that the Project, if financially sustainable <br />at all, could not generate sufficient revenue to provide public access, waterfront features and <br />other community-serving amenities which are fundamental, identified Project objectives. Based <br />on the foregoing and the discussion in Section 17.8 of the FEIR, the City finds that, on balance, <br />the Project provides substantially greater public benefits than Alternative 8 and that Alternative 8 <br />is not a feasible alternative to the Project. <br /> <br />I. Alternative Sites <br /> <br />Description: The FEIR considered the possibility of alternative sites for the <br />Project and concluded that there are no specific sites of adequate size and general character <br />available in the Mid-Peninsula subregion where development of such a project could be <br />undertaken that would accomplish most of the basic objectives of the Project and would avoid or <br /> <br />Atly/Reso/Reso.1772 <br />121707 <br /> <br />50 <br /> <br />14829 <br />Muff# 613 <br />