My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res81 8847
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
1980-1989
>
Res81 8847
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 1:34:30 PM
Creation date
10/11/2019 1:34:30 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
5/18/1981
Description
RES 0 L UTI 0 N ~ Q.. 8 84 7 RESOLUTION ACCEPTING THE REPORT OF THE COUNTY OF SAN MATEO RELATING TO THE CITY/COUNTY HIGHWAY PROGRAM OF 1981 AND SIGNIFYING DESIRE TO PARTICIPATE IN SAID PROGRAM MAY 1 8 1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />... <br /> <br />" . <br /> <br />o <br /> <br />o <br /> <br />4. Whipple Avenue and El Camino Real Traffic Signal Modifica- <br />tion Project <br />Estimated Cost: $53,000.00 <br />It is recommended that a dual left-turn lane be installed <br />southbound on El Camino Real to Whipple Avenue eastbound <br />and the free right-turn lanes removed. This will required <br />relocation of two signal standards, concrete removal and <br />roadway widening, accornrnodatedby the reduction in width <br />of the existing 10-foot sidewalk. <br /> <br />5. Whipple Avenue at Arguello Traffic Signal Modification Project <br />Estimated Cost: $31,000.00 <br />It is proposed that the existing traffic signal system at <br />the intersection of Whipple Avenue and Arguello Street be <br />modified to accept a railroad pre-emption system. Traffic <br />currently is backing across the railroad tracks, creating <br />significant hazards, due to a lack of pre-emption at this <br />location. <br /> <br />6. Roosevelt Avenue Reconstruction Project <br /> <br />Estimated Cost: $451,000.00 <br /> <br />It is proposed that Roosevelt Avenue, between El Camino <br /> <br />Real and Iris Street, be reconstructed. as the roadway is <br /> <br />experiencing significant failures. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.