My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res83 9306
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
1980-1989
>
Res83 9306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 1:37:54 PM
Creation date
10/11/2019 1:37:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
2/28/1983
Description
RES 0 L UTI 0 N N O. 9306 COPY RESOLUTION FINDING AND DECLARING THAT THE PRINCIPAL AMOUNT HEREIN SPECIFIED OF REDWOOD CITY GENERAL IMPROVEMENT DISTRICT NO. 1-64 1968 RECLAMATION BONDED INDEBTEDNESS HERETOFORE APPROVED BUT NOT INCURRED IS NOT NECESSARY FOR THE OBJECTS AND PURPOSES FOR WHICH APPROVED, AND CANCELLING AND VOIDING SAID AMOUNT APPROVED FEB 2 8 1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LXlil131 T "A" <br /> <br />1968 Election <br /> <br />MEASURES SUBMITTED TO VOTE OF VOTERS <br /> <br />Shall Redwood City General <br />Improvement District No. 1-6~ <br />incur a general obli~ation <br />bonded indebtedness in the <br />principal amount of $23,508,000 for the acqui- <br />sition, construction, improvement, maintenance <br />and operation of the following district project, <br />to wit: Reclamation and Drainage Project com- <br />prising (a) preparation works, including cleaning <br />out of depressions and slo~Rhs in areas to be <br />filled and disposition of unsuitable materials; <br />excavation of ponding basins and waterways; excava- <br />tion, grading, preparation and leveling with <br />on-site material of surface of areas to be filled; <br />and excavation of existing waterways and use of <br />excavated material as fill in specified areas or <br />disposition of same if unsuitable; (b) levee <br />works, inc1udin~ construction, reconstruction, <br />or removal of levees; construction of levee facin~ <br />or levee protection works; construction of jetties <br />or dams for harbors or for controlled level water- <br />ways; (c) fill and ~rading works, inc1udin~ exca- <br />vation, transportation, placing, gradin~ and com-, , <br />pacting of fill; and placin~ and removal of <br />imported fill surcharges where needed; (d) drain- <br />age system works, including construction of storm <br />draina~e collection systems, canals and appurten- <br />ant facilities, treatment of slopes and instal- <br />lation of drainage structures to protect adjacent <br />lands; (e) pump and dischar~e works, includin~ <br />construction of drainage pumping and dischar~e <br />facilities;-(f) control system works, includin~ <br />construction of drainage control structures , tide". .' - <br />gates and, appurtenances; installation or construc- <br />tion of water level control structures and appur- <br />tenances; and~construction or installation of con- <br />trol systems_to coordinate pumping'stations and <br />control structures; (g) lands,:rights-of-way and <br />easements for-any or all of s~id~orks; and (h) <br />other works, property or structures necessary or - <br />convenient cfor said project?". <br /> <br />MEASURE (A) : <br />{Reclamation and <br />Draina~e Project) <br /> <br />-1- <br /> <br />YES <br /> <br />NO <br /> <br />\ <br />\ <br /> <br />, <br />i : <br />! <br /> ! <br />
The URL can be used to link to this page
Your browser does not support the video tag.