My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res85 9792
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
1980-1989
>
Res85 9792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 1:42:17 PM
Creation date
10/11/2019 1:42:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
2/4/1985
Description
# fEB 4 '1985 A RESOLUTION DETERMINING TO UNDERTAKE PROCEEDINGS PURSUANT TO SPECIAL ASSESSMENT AND ASSESSMENT BOND ACTS FOR THE ACQUISITION AND CONSTRUCTION OF IMPROVEMENTS WITHOUT PROCEEDINGS UNDER DIVISION 4 OF THE STREETS AND HIGHWAYS CODE OF THE STATE OF CALIFORNIA SEAPORT BOULEVARD ASSESSMENT DISTRICT RESOLVED, by the City Council of the City of Redwood City, California, that
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT "An <br /> <br />a) The acquisition of property necessary for the widening of Seaport <br />Boulevard from East Bayshore Road to the southerly boundary of the <br />property of the Ideal Basic Industries, Inc., the acquisition of <br />property necessary for the construction of a storm drainage <br />retention basin and pumping station along the easterly side of <br />Seaport Boulevard from Blomquist Street to Chesapeake Drive and the <br />improvement of Seaport Boulevard from East Bayshore Road to a point <br />400 feet, more or less, northerly of Seaport Court by clearing, <br />grubbing, excavation and grading and the construction therein of <br />base, pavement, curbs, gutters, sidewalks, medians, bike paths, <br />traffic control devices, street signs and pavement markings, <br />underground serviced street lighting facilities, surface and <br />subsurface storm drainage facilities, where required, the <br />modification to an existing sewage force main in Seaport Boulevard <br />together with the construction of additional sewage force main <br />facilities, the adjustment of existing service utility facilities to <br />finish grade, the undergrounding of existing overhead electrical <br />transmission and distribution facilities and communication <br />transmission and distribution facilities, the installation of <br />casings crossing under the railroad tracks of the Southern Pacific <br />Transportation Company together with the installation of necessary <br />electrical, natural gas, water, sanitary sewer, storm sewer and <br />telephone facilities therein, the construction of a traffic signal <br />system at the intersection of Chesapeake Drive and Seaport Boulevard <br />together with the construction of underground conduits and pull <br />boxes for future traffic signal systems at the intersections of <br />Seaport Boulevard with Blomquist Street and Seaport Court and the <br />installation of landscaping, including irrigation and sprinkler <br />systems, where required, from u.S. Highway 101 to a point 400 feet, <br />more or less, northerly of Seaport Court. <br /> <br />b) The construction of railroad crossing facilities at Seaport <br />Boulevard and Chesapeake Drive including crossing gates, lights, <br />standards, signing, striping and marking, and traffic signal <br />interconnect and preempt facilities including underground conduits <br />and pu11boxes. <br /> <br />c) The acquisition of all lands, easements and rights of way and the <br />performing of all work auxiliary to any of the above and necessary <br />to complete the same. <br /> <br />City of Redwood City <br />Seaport Boulevard A.D. <br />01/22/85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.