Laserfiche WebLink
<br />CO~IE.: <br />o DIVISION <br /> <br />o APPLICANT <br />o ACCT. OPERS. <br />o DISTRICT <br /> <br />AGREEMENT TO INSTALL FACILITIES <br /> <br />"EI'E"ENCE: <br />SD71126 <br />GM4701850 <br />D&C <br /> <br />PACIFIC GAS AND ELECTRIC COMPANY <br /> <br />OR PERFORM OTHER WORK <br /> <br />SC <br /> <br />CITY OF REDWOOD CITY <br /> <br />hereinafter called Applicant, has requested Pacific Gas and Electric Company, hereinafter called PGandE, to <br />perform the work described below at or near PICO BLVD. <br />REDWOOD CITY <br /> <br />County of San Mateo , State of California. <br />PGandE will perform the work and furnish all necessary labor, appliances, materials and facilities re- <br />quired, subject to the following conditions: <br />1. The required work shall be as follows: <br />(Describe in detail the materials and facilities to be furnished and/or work to be done. For each facilit) installed, specificall)" indicate <br />whether ownership shall vest in PGandE or Applicant upon completion of work. If more space is required use other side and <br />attach any necessary drawings.) <br /> <br />RULE20B-Convert overhead distribution electric <br />facilities to underground distribution system...$31,538.00 <br />Inspection of trench and substructures..........$ 528.80 <br />crAC tax on applicant installed substructures <br />($19,000.00 PG&E value)........................ <br />CIAC tax on value of electric distribution <br />trench ($19,312.00 PG&E value).................. <br />RULE 16 <br />------- <br />Electric cable..................................$ 1,534.44 <br /> <br />COST <br /> <br />CIAC TAX <br /> <br />$8,830.64 <br />$ 148.06 <br /> <br />$5,320.00 <br /> <br />$5,407.36 <br /> <br />Contribution-in-Aid-of-Construction Tax (28%) C.P.U.C. approved <br />Decision No. 87-12-028 on December 9, 1987. <br />Applicant to trench and backfill and install substructures to PG&E's <br />specifications and install all substructures. <br />Upon completion of work, ownership of all facilities installed shall <br />vest in PG&E. <br />The prices quoted for this job may be revised if construction has not <br />started in 90 days. <br /> <br />2. Whenever part or all of the required work is to be furnished or performed upon property other than <br />that of Applicant, Applicant shall first procure from the owners thereof all rights of way and/or permits <br />necessary in a form satisfactory to PGandE and without cost to it. <br />3. Applicant shall immediately, upon demand and prior to construction by PGandE, pay to PGandE <br />as the complete contract price the sum of FIFTY-THREE THOUSAND THREE HUNDRED SEVEN <br />AND 30/100 dollars ($ 53.307.30 ). <br />Executed this day of , 19 89 <br /> <br />City of Redwood City <br />Applicant <br /> <br />PACIFIC GAS AND ELECTRIC COMPANY <br /> <br />BY: <br /> <br />BY: <br /> <br />(print or type name) <br />Mailing Address: 1017 MIDDLEFIELD RD. <br /> <br />JOHN C. BRISKY <br /> <br />(print or type name) <br />FOR: Manager, PENINSULA <br /> <br />Division <br /> <br />ATTN: JON LYNCH, REDWOOD CITY, CA 94064 <br /> <br />62.4527 REV. 10.84 <br />