My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord06 2298
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
Ordinances
>
2000-2009
>
Ord06 2298
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 2:59:31 PM
Creation date
10/11/2019 2:59:30 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Agency Type
City Council
Date
4/3/2006
Description
ORDINANCE AMENDING SECTION 18.249 OF ARTICLE XV TO CHAPTER 18 OF THE CODE OF THE CITY OF REDWOOD CITY RELATING TO TRANSPORTATION IMPACT FEES FOR NEW DEVELOPMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4/3/2006 <br /> <br />gross square footage or gross leasable square footage as defined for a particular <br /> <br />land use category in the "Trip Generation Manual" published by the Institute of <br /> <br />Transportation Engineers (latest edition), for the purpose of calculating trip <br /> <br />generation. <br /> <br />2. <br /> <br />When more than one land use is proposed within the same Development, the <br /> <br />Impact Fee for each land use shall be calculated separately and the total fee of <br /> <br />the various uses shall be imposed, If an Applicant contends that the mixed-use <br /> <br />Development will generate less traffic than the sum of the individual land uses, <br /> <br />the Applicant may submit an Independent Trip Generation Calculation Study as <br /> <br />set forth in subdivision B of this Section, The Administrator shall determine the <br /> <br />trip generation taking into consideration the Independent Trip Generation <br /> <br />Calculation Study, <br /> <br />B. <br /> <br />Independent Trip Generation Calculation: <br /> <br />1. <br /> <br />If a Development is for a land use not expressly described in the Impact Fee <br /> <br />Schedule, or an Impact Fee is not clearly ascertainable by reference to said <br /> <br />schedule, the Administrator shall select the Impact Fee for the most nearly <br /> <br />comparable type of land use specified in said schedule, The Administrator shall <br /> <br />be guided in the selection of a comparable type by the "Trip Generation Manual," <br /> <br />published by the Institute of Transportation Engineers (latest edition). If the <br /> <br />Administrator determines that there is no comparable land use category in said <br /> <br />Manual, the Applicant may submit an Independent Trip Generation Calculation <br /> <br />Study of PM Peak Hour Trip Generation Rates using a technically and <br /> <br />statistically sound methodology (e.g" traffic counts for similarly situated and <br /> <br />Atty/Ord/Ord,258 3 <br />032806 Ord 2298 <br />formerly muff# 505 <br />
The URL can be used to link to this page
Your browser does not support the video tag.