Laserfiche WebLink
DES:dj'' 12/19/96 (030/09) <br /> <br /> (3) Exclusions. <br /> <br /> (i) The foregoing fee shall not be applicable to <br /> connections to the Sewerage Facilities or to a <br /> Sewer Lateral with respect to which sewerage <br /> treatment capacity included within City's <br /> allocation of 11.4 million gallons per day flow in <br /> Authority's treatment facilities has been <br /> purchased pursuant to agreement entered into <br /> between the City and the owner of the property to <br /> be served by such capacity or with respect to <br /> which sewerage treatment capacity has been <br /> otherwise purchased or provided by, or on behalf <br /> of, such owner, as determined by City's Director. <br /> <br /> (ii) The foregoing fee shall not be applicable to <br /> connections made to public sewers maintained by <br /> the West Bay Sanitary District or the Fair Oaks <br /> Sewer Maintenance District within the City. <br /> <br /> (4) Additional Dwelling Units. In the event <br /> additional dwelling units are to be constructed <br /> which would increase the number of dwelling units <br /> being served by a single sewer connection, a <br /> Wastewater treatment capacity fee shall be paid <br /> for such additional dwelling units in accordance <br /> with Subdivision (a) (1). The fee payable shall be <br /> the amount by which the Wastewater treatment <br /> capacity fee calculated upon the number of <br /> dwelling units after such construction exceeds the <br /> Wastewater treatment capacity fee calculated upon <br /> the number of dwelling units prior to such <br /> construction. <br /> <br /> (5) Additional Industrial Volume. In the event the <br /> volume of Waste or Wastewater to be discharged <br /> into the Sewerage Facilities from a commercial, <br /> industrial, institutional, or other non- <br /> residential structure is increased by installation <br /> of additional plumbing fixtures or enlargement, <br /> expansion, or reconstruction of said structure, <br /> and such structure is to be served by an existing <br /> sewer connection, a Wastewater treatment capacity <br /> fee shall be paid for such additional volume in <br /> accordance with Subdivision (a) (2). The fee <br /> payable shall be the amount by which the <br /> Wastewater treatment capacity fee calculated upon <br /> the total volume after the increase exceeds the <br /> Wastewater treatment capacity fee calculated upon <br /> the volume prior to such increase." <br /> <br /> SECTION 2. This ordinance shall be effective thirty (30) <br />days from the date of its adoption. <br /> <br /> 3 <br /> <br /> <br />