My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord80 1830
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
Ordinances
>
1980-1989
>
Ord80 1830
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 3:11:30 PM
Creation date
10/11/2019 3:11:30 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Date
11/10/1980
Description
AN ORDINANCE AMENDING SECTION 30.136 OF THE CODE OF THE CITY OF REDWOOD CITY RELATING TO WATER METERS THE COUNCIL OF REDWOOD CITY DOES ORDAIN AS FOLLOWS: SECTION l. Section 30.136 of the Code of the City of Redwood City is hereby amended to read as follows: "Section 30.136 Condominium and Community Apartment Development Standards. Each condominium project and eac~ community apartment project shall contain the following: " (a) Meter and Control Valves. Each unit within a project shall have a separate meter to register the consumption of gas, electricity and water within such unit so that each unit owner may be individually billed for such
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ".. ~ .. - .. ....- .'.,'. ... ...- - .-. .._-,_._- <br /> DES:yc:10/31!.80 ,", <br /> ~ <br /> ORIGINAL <br /> ORDINANCE NO. 1839 <br /> <br /> --------- - - <br />AN ORDINANCE AMENDING SECTION 30.136 OF THE CODE OF <br />THE CITY OF REDWOOD CITY RELATING TO WATER METERS <br />THE COUNCIL OF REDWOOD CITY DOES ORDAIN AS FOLLOWS: <br />SECTION l. Section 30.136 of the Code of the City of Redwood <br />City is hereby amended to read as follows: <br />"Section 30.136 Condominium and Community Apartment <br />Development Standards. Each condominium project and eac~ <br />community apartment project shall contain the following: <br />" (a) Meter and Control Valves. Each unit within a project <br /> shall have a separate meter to register the consumption <br /> of gas, electricity and water within such unit so that <br /> each unit owner may be individually billed for such <br /> consumption. Upon application of the developer, <br /> the Planning Commission may grant an exception to <br /> the foregoing requirement that each unit shall have <br /> a separate meter to register the consumption of water <br /> if it determines that <br /> " (1) the water for such project is to be heated by <br /> a solar energy system, <br /> " (2) energy savings will result from such solar <br /> energy system, and <br /> " (3) the project, or the property upon which it is <br /> located, is of such shape or size, or is so <br /> located, or is so affected by topographical <br /> conditions that it is impractical to use <br /> separate water meters. <br />" (b) Noise Insulation. Each project shall comply with <br /> applicable regulations relating to sound insulation <br /> for the buildings and structures therein. <br />" (c) Energy Insulation. Each project shall comply with <br /> applicable regulations relating to energy insulation <br /> for the buildings and structures therein." <br />SECTION 2. This ordinance shall be effective 30 days after <br />its adoption. <br /> * * * 1 830 <br /> _.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.