Laserfiche WebLink
[COA][PLANNING] <br />14. Street Trees — A total of four (24 -inch box) street trees shall be planted along <br />Woodside Road frontage. The tree species and location will be determined by the <br />City Landscape Architect. These improvements shall be included as part of the <br />building permit submittal package. Newly planted trees shall be both irrigated and <br />maintained by the applicant. [SDR][PLANNING] <br />15. Stormwater Runoff — Post -construction runoff into the storm drain shall not exceed <br />pre- construction runoff levels. The applicant's design professional shall evaluate the <br />project's impact to the City's storm drainage system and shall substantiate their <br />conclusions with drainage calculations to the satisfaction of the City Engineer. The <br />project shall be designed in conformance with the Drainage Guidelines for <br />Commercial Development. [SDR] [ENGINEERING] <br />16. Exterior Lighting — Provide a lighting plan for proposed exterior lighting, including <br />cut sheets, a photometric site plan demonstrating light levels and a diagram <br />showing light spillover. This information shall be included in the building permit <br />plans. New light sources must not introduce glare or light effects that spill off the <br />property. [COA][PLANNING] <br />17. Site Grading — Site grading shall be designed to allow for overland release to the <br />street. No stormwater from the project site shall be allowed to run off onto adjacent <br />private properties. [SDR] [ENGINEERING] <br />18. Site Drainage — As currently designed on the Tentative Map, the site grading <br />slopes away from the building at 2% toward the adjacent properties, and then there is <br />a concrete curb around the perimeter of the site in order to prevent stormwater from <br />running off to the adjacent properties. If the rainfall rate on the site is higher than the <br />infiltration rate available in the previous pavers, or if the pervious pavers are <br />clogged, there will be ponding on the pervious pavers within the main walkway to the <br />front doors of each of the units. The fact that this ponding will occur shall be included <br />in the disclosures for the property so that potential buyers are aware. <br />[COA][ENGINEERING] <br />19. Project Benchmark — The project shall tie to a City Standard benchmark. The <br />benchmark information shall be identified on the cover sheet of the improvement <br />plans, and the elevations shall be on the NAVD88 datum. [SDR] [ENGINEERING] <br />20. Bicycle Facilities — The project shall provide onsite bicycle lockers for a minimum <br />capacity of 4 bicycles. The project shall also provide two bike racks on the new <br />sidewalk. These facilities shall be shown on the building permit plans. <br />[COA][ENGINEERING] <br />21. Electric Vehicle Charging Stations — Provide for 2 onsite parking spaces <br />equipped with electrical vehicle (EV) charging stations and demonstrate this on the <br />building permit plans. [COA][ENGINEERING] <br />22. Screening for Backflow Prevention Device — Screening shall be horizontal <br />Page 12 of 26 <br />ATTY/RESO.0098/PC RESO 910 WOODSIDE ROAD <br />REV: 10-09-19 PR <br />