Laserfiche WebLink
D. Contractor will complete PM inspections for all water pumps and motors annually. <br />E. Contractor will contact City staff to arrange for pump station site access to perform <br />PM inspections. Contractor will perform all PM inspections during the work week <br />(Monday to Friday) between 7 AM and 4 PM. If Contractor is called away and <br />cannot complete the scheduled PM, Contractor will return the next working day. <br />F. Contractor will notify City staff immediately upon discovering any emergency or <br />immediate repairs needed to a pump during the course of PM inspections. <br />Task 2: Major Repairs and Replacements <br />A. Contractor will obtain written approval from City staff before starting any major <br />repairs. <br />B. Contractor will submit to City staff the following information in order to obtain <br />written approval for a repair: <br />• A description of the work determined to be necessary; <br />• A cost estimate for such work; and <br />• An expected timeline for completion. <br />C. Contractor will remove, transport, repair, or replace, and re -install pumps, motors, <br />and related equipment to and from the City's water pump stations. <br />D. Contractor will coordinate with City staff for access to the pump stations. <br />Task 3: On -Call and Emergency Repairs <br />A. Contractor will maintain a telephone number for the entire term of the Agreement, <br />and any and all extensions, at which City staff can reach Contractor 24 hours a <br />day, 365 days a year for on-call and emergency repair requests. <br />B. Contractor will respond to emergency repair requests, defined as requests which <br />City staff specify is an emergency repair request at the time of request for service, <br />within 4 hours of receiving notice from City staff. Notice may include written or <br />verbal communication, including, but not limited to, emails and phone calls. <br />Contractor will perform a site visit within 24 hours of receiving notice from the City <br />for emergency repairs and will utilize best available options to provide a timely <br />resolution. <br />C. Contractor will respond within 48 hours to on-call repair requests, defined as non- <br />emergency repair requests. <br />General Requirements <br />A. Parts and Materials <br />Contractor will have available an inventory of common parts and materials needed to <br />maintain the City's water pumps and motors. Contractor must have materials needed for <br />preventative maintenance available at all times. <br />B. Damages <br />Contractor is responsible for any damage caused by Contractor's staff during the course <br />of their work and will correct any damages as directed by the City within an agreed upon <br />timeframe. <br />REV: 09-16-2020 EI <br />ATTY/AGR.Amend No. 1/Pump Repair Service Co. (Page 4 of 6) <br />