My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Pump Repair Serivce Co.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Pump Repair Serivce Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:25:10 AM
Creation date
10/23/2019 12:59:48 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Pump Repair Serivce Co.
PROJECT NAME
Maintenance and repair of water and recycled water pumps
RMP File Number
304
Date
10/17/2019
MO Ref
MO 19-193
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 09-19-2022 MI <br />Exhibit “A” <br />PAYMENT TERMS <br />Contractor shall provide the services outlined in the Agreement on a per task basis. Fees <br />will be billed based on the actual hours and materials used per the rate schedule as <br />described below. <br />A. Task 1: Preventative Maintenance (PM) <br />Task Description Cost <br />Annual Preventative <br />Maintenance <br />Maintain existing water <br />pumps and motors and <br />includes materials and labor <br />$8,450.00 per <br />year <br />Addition or Removal of <br />Pump <br /> Addition or removal of pump <br />from the existing water pump <br />system <br />$248.00 per <br />pump <br />B. Task 2 and 3: Major Repairs and Replacements and On-Call and Emergency <br />Repairs <br />Description Rate <br />Shop Labor $135.00 per <br />hour <br />Shop Labor – Overtime* $202.50 per <br />hour <br />Field Labor $135.00 per <br />hour <br />Field Labor – Overtime* $202.50per hour <br />Machine Labor $150.00 per <br />hour <br />Machine Labor – Overtime* $225.00 per <br />hour <br />9 Ton Boom Truck $500 per day <br />17 Ton Boom Truck $600 per day <br />Service Truck $75 per day <br />Material Markup 5% to 10% of <br />Contractor’s <br />Direct Cost <br />* The overtime rate will be charged for work that exceeds an 8-hour workday or any <br />emergency repair weekend work. <br />ATTY/AGR.2022 - Amend No. 2/Pump Repair Service Co. (Page 4 of 4)
The URL can be used to link to this page
Your browser does not support the video tag.