My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-10-28 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-10-28 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:14:56 PM
Creation date
10/25/2019 8:11:45 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/28/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLK-Pamela Aguilar <br />From: Kathy Voss <vossorganizing@gmail.com> <br />Sent: Saturday, October 26, 2019 7:45 PM <br />To: GRP -City Council <br />Cc: Carol Cross <br />Subject: Addressing concerns about Reach Codes for all -electric buildings <br />This e-mail is from an external source. Please do not open attachments or click links from an unknown or <br />suspicious origin. osxfoi <br />To the City Council Members of Redwood City: <br />At the Sept. 23 City Council meeting, several city council members voiced concerns about enacting <br />Reach Codes that require all -electric buildings and EV charging. Here is some information from PCE <br />that addresses those concerns: <br />1) EV Charging in affordable housing: City council members expressed concern that the cost of <br />installing EV chargers in new housing might drive up rental costs, especially for new affordable <br />housing. <br />Answer from PCE's Rafael Reyes: "PCE absolutely will offer incentives for EV charging at the <br />construction of affordable housing. Our intention is to make installation of charging at new <br />affordable housing cost neutral. This is a high priority as part of our EV charging program expected <br />to launch mid -2020." <br />2) Grid readiness: Will the electrical capacity be there, through PCE, as new all -electric buildings <br />(with their EV chargers) come on line? <br />PCE's Rafael Reyes responded: "PG&E has already sent a letter to RWC supporting reach codes <br />and committing to grid readiness. We have a similar letter for PCE territory as a whole." Mr. Reyes <br />emailed me the letter from PG&E to PCE, in which PG&E states that: <br />"PG&E continuously forecasts load in its service territory and implements upgrades to the distribution <br />grid to meet increased demand.... Each request for new or increased service is evaluated to <br />determine if site-specific distribution upgrades are required. PG&E fully expects to meet the needs <br />that all -electric buildings will require." <br />3) Methane Capture and Use: Will methane captured from landfills be wasted if new buildings are <br />required to be all -electric? <br />Info from my research: Methane from landfills can be used to produce electricity (a new electricity <br />generation plant in Half Moon Bay will start functioning in a few months - Mercury News article here). <br />Captured methane can also potentially be added to the natural gas supply (Source: Drawdown.org). <br />Whether captured methane is used to generate electricity or is added to the gas supply and used in <br />older buildings that still use natural gas, the captured methane will not be wasted. Therefore, there is <br />no conflict between a reach code that requires NEW buildings to be all -electric and making good use <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.